Ecología y Tecnología Ambiental (Ecotec)

Ecología y Tecnología Ambiental (Ecotec)

Ecología y Tecnología Ambiental SA (Ecotec) is a private company part of the Corporation Graña y Montero, with more than 14 years experience in the national and international market.

The company carries out environmental impact studies and supervise all kinds of projects related to the use or sustainable exploitation of natural resources.

Ecotec offers services such as monitoring and supervision of the production processes which have an impact on the environment and pollute ecosystems, and investment projects aimed at the management and exploitation of natural resources in the context of sustainable development. We manage solid waste and liquids (hazardous or non-hazardous), and design prevention and mitigation measures for the various sectors of production with the objective of minimizing environmental pollution.

The sectors in which we work include mining, hydrocarbons, energy, industry and tourism, housing, transport, agribusiness and health.

Inmaculada Gold and Silver Mine
2013

Construction Environmental Management

Inmaculada Gold and Silver Mine, Ayacucho, Peru

Inmaculada mining project construction environmental supervision of the construction of the; it included the implementation of environmental commitments in the construction phase.

Ecotec was in charge of conducting operational controls and implementing environmental management plans agreements making sure all environmental monitoring established in the construction phase took place; Ecotec also performed the solid waste management and developed environmental reports.

Source: Ecotec
8.267Engineering man hours (K)
Antamina Copper Mine
2013

Soils & Vegetation Monitoring Program

Antamina Copper Mine, Ancash, Peru

The Soil and Vegetation Monitoring Program periodically evaluates the soil and vegetable tissues of related plants, especially those for agricultural use, in order to determine the presence of metals.

The work consisted of simultaneous field sampling of soils, cultivated plants and wild forage tissues. The sampling was performed according to the 02 major drainage basins and dispersal potential and based on its relationship with specific components of the operation. The preparation and preservation of samples was performed according to the best practices of custody chain, refrigeration and transportation. The samples were analyzed by an accredited testing laboratory, following exact analytical and calibration procedures.

The results obtained for soil and plant tissues were tested with reference values established by the program and derivatives of international sources. In the case of soils, for the first time they were compared with national soil quality standards.

The final analysis included a special and temporal approach, including the integration of information generated during the previous monitoring, weather data, air and water quality, among others. The results provided valuable information that indicates not only the state of the soils and associated vegetation, especially in the crops area near to the exploitation area; but they are also useful as an environmental indicator for the mine’s surrounding conditions.

Source: Ecotec
0.784Engineering man hours (K)
Cerro de Pasco Administrative Economic Unit
2013
US$ 35.9K

Technical report

Cerro de Pasco Administrative Economic Unit, Cerro de Pasco, Peru

Preparation of technical report including: Sanitary landfill engineering design, organic waste treatment plants design, reuse of solid commercial inorganic waste plant design, management in order to modify budget as much as 100% under the Public Investment System.

Support on project approval process by municipal authorities, OPI, MEF, DIGESA and organized population.

Source: Ecotec
Cerro de Pasco Administrative Economic Unit
2013
US$ 108K

Feasibility studies

Cerro de Pasco Administrative Economic Unit, Cerro de Pasco, Peru

Feasibility study to estimate the infrastructure cost, to modify the approved amount by the SNIP (Sistema Nacional de Inversion Publica), of integral solid waste management in the city of Cerro de Pasco.

Source: Ecotec
Constancia Copper Mine
2012
US$ 35.9K

Technical report

Constancia Copper Mine, Cusco, Peru

Technical file preparation to obtain a favorable technical opinion on the domestic wastewater sanitary treatment and disposal system.

Technical file preparation to obtain the discharge permit for treated wastewater.

Technical file preparation for DIGESA to obtain the sanitary authorization for the potable water treatment systems of camps.

Source: Ecotec
5.818Engineering man hours (K)
Las Bambas Copper Mine
2011

Environmental Management & Adjustment Program

Las Bambas Copper Mine, Apurímac, Peru

Environmental management plan for wetlands, incinerators, earthmoving, construction debris, potable water treatment plants and wastewater treatment plants, runoff control, quarries, slope stability and explosives.

Monitoring of the water source for treatment and purification.

Source: Ecotec
Las Bambas Copper Mine
2011
US$ 139.5K

Detailed engineering

Las Bambas Copper Mine, Apurímac, Peru

Detailed engineering for excess material deposits, runoff ditch, sewers for access roads.

Source: Ecotec
Las Bambas Copper Mine
2011

Hydrological studies

Las Bambas Copper Mine, Apurímac, Peru

Authorization for the use of water, flow redistribution, water usage studies.

Hydrological study of the cemetery and the sanitary landfill. Hydrological assessments for the design of excess material deposits.

Source: Ecotec
Las Bambas Copper Mine
2011

Solid waste management

Las Bambas Copper Mine, Apurímac, Peru

Management plan, determination of characteristics and situational diagnosis of solid waste for the district of Challhuahuacho.

Environmental classification, site selection, environmental impact statement, public investment profile and detailed engineering design for the Challhuahuacho sanitary landfill.

Source: Ecotec
Las Bambas Copper Mine
2011

Semi-detailed Environmental Impact Assesment (SDEIA)

Las Bambas Copper Mine, Apurímac, Peru

Semi-detailed environmental impact study for the change of rural land or wasteland into urban land.

Source: Ecotec
Organic Waste Treatment Plant (OWTP)
2010

Solid waste management

Organic Waste Treatment Plant (OWTP), Peru

Temporary storage, collection, transportation, central storage and disposal of non-hazardous municipal and non-municipal solid waste.

Operation of Solid Waste Organic Treatment Plant includes: Treatment of organic solid waste with composting technic, set up of compost heaps, physical, chemical and biological agents control, sieving and bagged of compost (final product).

The Implementation project of the Organic Waste Treatment Plant (OWTP) consisted in making compost (organic fertilizer) with food waste coming from UNACEM’s dining rooms, as well as from the manure provided by suppliers of the population centers nearby, such as Limapuquio, Aogucro and Pomacacha.

Source: Ecotec
Organic Waste Treatment Plant (OWTP)
2010

Industrial cleaning services

Organic Waste Treatment Plant (OWTP), Peru

Industrial cleaning services framework agreement, it includes: Furnaces and mills (including the re-use of material spills), paving stones, camps and offices, compressor rooms and electrical substations, metal roofs and structures.

It also includes: Interior and exterior parts of silos (crude, cement and coal), classification, weighing and loading of crushing bodies, industrial painting., water intake (including water entry control and flow measurement), potable and waste water treatment system units.

Source: Ecotec

More projects, Company brochure, contact details and site photos are all included in the PDF.

Snapshot

Company Url
Sector
Construction & Engineering Sub-Industry
Recorded Contracts
12

Services

Technical report
Feasibility studies