GMI Ingenieros Consultores

GMI Ingenieros Consultores

GMI, a leading engineering consultancy company in Peru, has over 30 years of experience developing work style based on the same values that define Graña & Montero Group, which are Quality, Compliance, Reliability and Efficiency.

GMI has a skilled, multidisciplinary team of professionals and consultants specialized in research, engineering, supervision, geomatics, materials management, project management, EPCM services, environmental services and environmental consulting.

Antamina Copper Mine
2015

Construction Management (CM)

Antamina Copper Mine, Ancash, Peru

Construction management for inert dump grinding system, service road corridor and re-location of the electric room.

Source: GMI Ingenieros Consultores
Southern Interoceanic Highway project Peru - Brazil
2015

Definitive studies

Southern Interoceanic Highway project Peru - Brazil, Peru

Definite study for the re-construction of the stretch affected by catastrophic events.

Works executed for Survial SA.

Source: GMI Ingenieros Consultores
Pierina Gold Mine
2015

Detailed engineering

Pierina Gold Mine, Ancash, Peru

Detailed engineering for he pumping station that supplies to ARD 450 water treatment plant.

Source: GMI Ingenieros Consultores
Colquijirca Mining Unit (Brocal)
2015

Solid waste management

Colquijirca Mining Unit (Brocal), Pasco, Peru

Integral service of mine waste management.

Source: GMI Ingenieros Consultores
Malvinas separation plant
2015

Construction Management (CM)

Malvinas separation plant, Cusco, Peru

Construction management for the works improvement of Malvinas separation plant.

Source: GMI Ingenieros Consultores
Pisco Natural Gas Liquids (NGL) Fractionation Plant
2015

Construction Management (CM)

Pisco Natural Gas Liquids (NGL) Fractionation Plant, Ica, Peru

Construction management for the works improvement of Pisco Natural Gas Liquids (NGL) fractionation plant.

Source: GMI Ingenieros Consultores
Buenos Aires - Canchaque Section 1B
2015

Technical report

Buenos Aires - Canchaque Section 1B, Peru

Technical File for the construction of the Filadera bridge.

Works executed for Concesión Canchaque.

Source: GMI S.A. Ingenieros Consultores
Smelting plant
2015

Environmental Impact Assessment (EIA)

Smelting plant, Peru

Environmental impact assessment (EIA) for the smelting plant.

Source: GMI Ingenieros Consultores
Zafranal Project
2015

Pre-feasibility studies

Zafranal Project, Peru

Pre-feasibility study for the energy supply.

Source: GMI Ingenieros Consultores
La Pampilla refinery
2015

Engineering and Design

La Pampilla refinery, Peru

Engineering and supervision framework agreement for investment projects.

Source: GMI Ingenieros Consultores
Pisco airport
2015

Soil and pavement studies

Pisco airport, Ica, Peru

Functional and structural evaluation of Pisco airport runway pavement.

Source: GMI S.A. Ingenieros Consultores
Anta airport
2015

Soil and pavement studies

Anta airport, Ancash, Peru

Functional and structural evaluation of Anta airport runway pavement.

Source: GMI S.A. Ingenieros Consultores
Chachapoyas airport
2015

Soil and pavement studies

Chachapoyas airport, Amazonas, Peru

Functional and structural evaluation of Chachapoyas airport runway pavement.

Source: GMI S.A. Ingenieros Consultores
Toquepala Copper-Molybdenum Mine
2014

Detailed engineering

Toquepala Copper-Molybdenum Mine, Tacna, Peru

Detailed engineering and procurement of the new workshops for light and medium equipment tractors.

Source: GMI Ingenieros Consultores
Racaycocha
2014

Basic Engineering Design (BED)

Racaycocha, Peru

Basic engineering of the energy supply, runway and access road of Racaycocha mining project.

Source: GMI S.A. Ingenieros Consultores
Pisco Natural Gas Liquids (NGL) Fractionation Plant
2014

Corrosion control action plan

Pisco Natural Gas Liquids (NGL) Fractionation Plant, Ica, Peru

Pisco plant corrosion control action plan.

Source: GMI S.A. Ingenieros Consultores
Las Bambas Copper Mine
2014

Solid waste management

Las Bambas Copper Mine, Apurímac, Peru

Waste management plan update for Chalhuahuacho district.

Source: GMI S.A. Ingenieros Consultores
Cerro Lindo lead zinc and copper mine
2014

Detailed engineering

Cerro Lindo lead zinc and copper mine, Ica, Peru

Basic and detailed engineering of the new desalination rails in Cerro Lindo mining operation.

Source: GMI S.A. Ingenieros Consultores
Melchorita Liquified Natural Gas (LNG) Plant
2014

Basic Engineering Design (BED)

Melchorita Liquified Natural Gas (LNG) Plant, Peru

Basic engineering for the 4th filter of Melchorita Liquified Natural Gas (LNG) Plant.

Source: GMI Ingenieros Consultores
Talara Refinery Modernization Project
2014

Construction Management (CM)

Talara Refinery Modernization Project, Peru

Fire proof system and electro pump system work supervision.

Source: GMI S.A. Ingenieros Consultores
Ancon - Huacho - Pativilca Road Network No.5
2014

Definitive studies

Ancon - Huacho - Pativilca Road Network No.5, Peru

Definite studies for construction of major work structures under active regulations. Path: Huacho - Pativilca.

Works executed for Norvial.

Source: GMI S.A. Ingenieros Consultores
El Porvenir
2014

Basic Engineering Design (BED)

El Porvenir, Cerro de Pasco, Peru

Environmental studies, conceptual and basic engineering for the El Porvenir mining operation concentrator plant expansion.

Source: GMI S.A. Ingenieros Consultores
Condorcocha plant
2014

Environmental Impact Assessment (EIA)

Condorcocha plant, Peru

Kiln No.5 new production line EIA development, presentation and follow up.

Source: GMI S.A. Ingenieros Consultores
Cerro Verde Copper-Molybdenum Mine
2014

Basic Engineering Design (BED)

Cerro Verde Copper-Molybdenum Mine, Arequipa, Peru

Conceptual and basic engineering of La China access road.

Source: GMI S.A. Ingenieros Consultores
Cerro Verde Copper-Molybdenum Mine
2014

Engineering and Design

Cerro Verde Copper-Molybdenum Mine, Arequipa, Peru

Truck workshop pre-engineering.

Source: GMI S.A. Ingenieros Consultores
Conchan refinery
2014

Basic Engineering Design (BED)

Conchan refinery, LIma, Peru

Basic engineering of Conchan Refinery No 2, No.4 and No. 7 dispatch modules qualification and assembly.

Source: GMI S.A. Ingenieros Consultores
Expansion of Arequipa finished goods warehouse
2014

Construction Management (CM)

Expansion of Arequipa finished goods warehouse, Arequipa, Peru

Work supervision of the 6,500 m2 expansion of Arequipa finished goods warehouse.

Source: GMI S.A. Ingenieros Consultores
Ica Home Farm
2014

Environmental Impact Statement (EIS)

Ica Home Farm, Ica, Peru

Environmental technical support and Environmental Impact Statement (EIS) for ongoing activities in the agroindustrial processing plant .

Source: GMI S.A. Ingenieros Consultores
Peru production building
2014

Construction Management (CM)

Peru production building, Peru

Procurement and work supervision of the production building structural reinforcement and equipment.

Source: GMI S.A. Ingenieros Consultores
Ica Home Farm
2014

Basic Engineering Design (BED)

Ica Home Farm, Ica, Peru

Basic engineering for the agro industrial plant waste water treatment process.

Source: GMI S.A. Ingenieros Consultores
Antamina Copper Mine
2014

Detailed engineering

Antamina Copper Mine, Ancash, Peru

Services Corridor Phase I detailed engineering.

Source: GMI S.A. Ingenieros Consultores
Bayovar Port Terminal
2014

Detailed engineering

Bayovar Port Terminal, Peru

Bayovar port ship loader structural analysis detailed engineering

Source: GMI S.A. Ingenieros Consultores
Antapaccay Copper Mine
2014

Definitive studies

Antapaccay Copper Mine, Cusco, Peru

Final study for Antapaccay by pass access road.

Source: GMI S.A. Ingenieros Consultores
Block 67
2014

Pipe stress analysis

Block 67, Loreto, Peru

Stress studies of Piraña Field of Block 67 PP1 and EV4 pipelines.

Source: GMI S.A. Ingenieros Consultores
Shahuindo
2014

Definitive studies

Shahuindo, Cajamarca, Peru

Final study for Shahuindo mine access road.

Source: GMI S.A. Ingenieros Consultores
Lagunas Norte mine
2014

Feasibility studies

Lagunas Norte mine, La Libertad, Peru

Feasibility study for the pumping system of the collection pond in Lagunas Norte.

Source: GMI S.A. Ingenieros Consultores
Las Bambas Copper Mine
2014

Water usage authorization

Las Bambas Copper Mine, Apurímac, Peru

Water use authorization for Las Bambas mine access roads.

Source: GMI S.A. Ingenieros Consultores
Cerro Verde Copper-Molybdenum Mine
2014

Detailed engineering

Cerro Verde Copper-Molybdenum Mine, Arequipa, Peru

Detailed engineering for the relocation of the seepage pumping station.

Source: GMI S.A. Ingenieros Consultores
Antapaccay Copper Mine
2014

Basic Engineering Design (BED)

Antapaccay Copper Mine, Cusco, Peru

Basic engineering of the overpass in the access road to Antapaccay.

Source: GMI S.A. Ingenieros Consultores
Cerro Verde Copper-Molybdenum Mine
2014

Detailed engineering

Cerro Verde Copper-Molybdenum Mine, Arequipa, Peru

Industrial waste water treatment plant detailed engineering.

Source: GMI S.A. Ingenieros Consultores
Ancon - Huacho - Pativilca Road Network No.5
2014

Detailed engineering

Ancon - Huacho - Pativilca Road Network No.5, Peru

Detailed engineering of complementary works (Pontoons).

Works executed for Norvial.

Source: GMI S.A. Ingenieros Consultores
Hilarion mine
2014

Biological monitoring

Hilarion mine, Ancash, Peru

Biological monitoring.

Source: GMI S.A. Ingenieros Consultores
Pukaqaqa Project
2014

Biological monitoring

Pukaqaqa Project, HUANCAVELICA, Peru

Biological monitoring.

Source: GMI S.A. Ingenieros Consultores
Marcona Iron Mine
2014

Archaeological evaluations

Marcona Iron Mine, Ica, Peru

Marcona mine expansion archaeological evaluations.

Source: GMI S.A. Ingenieros Consultores
Grinding circuit
2014

Environmental Impact Assessment (EIA)

Grinding circuit, Peru

Grinding circuit EIA.

Source: GMI S.A. Ingenieros Consultores
Cerro Verde Copper-Molybdenum Mine
2014

Detailed engineering

Cerro Verde Copper-Molybdenum Mine, Arequipa, Peru

Detailed engineering for the second relocation of cyclones and associated installations.

Source: GMI S.A. Ingenieros Consultores
Cerro Verde Copper-Molybdenum Mine
2014

Engineering and Design

Cerro Verde Copper-Molybdenum Mine, Arequipa, Peru

Design of the main collector pre-design structures.

Works executed for Fluor.

Source: GMI S.A. Ingenieros Consultores
Ancon - Huacho - Pativilca Road Network No.5
2014

Detailed engineering

Ancon - Huacho - Pativilca Road Network No.5, Peru

Detailed engineering for complementary work at Centenary overpass.

Works executed for Norvial.

Source: GMI S.A. Ingenieros Consultores
Antamina Copper Mine
2014

Basic Engineering Design (BED)

Antamina Copper Mine, Ancash, Peru

Basic engineering of the north side temporary tailings pumping system and south side tailings pipeline extension.

Works executed for Fluor.

Source: GMI S.A. Ingenieros Consultores
Peru production building
2014

Detailed engineering

Peru production building, Peru

Detailed engineering, tender and work supervision for the structural equipment and reinforcement of production building and offices.

Source: GMI S.A. Ingenieros Consultores
Ancon - Huacho - Pativilca Road Network No.5
2014

Detailed engineering

Ancon - Huacho - Pativilca Road Network No.5, Peru

Detailed engineering for major works adjusted to active regulations.

Works executed for Norvial.

Source: GMI S.A. Ingenieros Consultores
Antapaccay Copper Mine
2014

Detailed engineering

Antapaccay Copper Mine, Cusco, Peru

Operability study for the Tintaya sulphides plant reentry, work includes the development of the 33kV system situational status report. Identification of main problems, recommendation of solutions and estimation of solutions costs.

Improvements in the nitrates field, the project consists of the detailed engineering for the material transport equipment construction and a 80 tn capacity hopper along with its discharge systems.

Works executed as part of the Engineering Framework Agreement.

Source: GMI Ingenieros Consultores
35.236Engineering man hours (K)
Cerro Verde Copper-Molybdenum Mine
2014

Topographic survey

Cerro Verde Copper-Molybdenum Mine, Arequipa, Peru

Topographic control for the Phase III - PAD 1 construction at Cerro Verde mine.

Works executed for GyM.

Source: GMI S.A. Ingenieros Consultores
Inmaculada Gold and Silver Mine
2014

Engineering and Design

Inmaculada Gold and Silver Mine, Ayacucho, Peru

Field engineering.

Works executed for GyM.

Source: GMI S.A. Ingenieros Consultores
Arequipa plant No.1
2014

Engineering, procurement and construction management (EPCM)

Arequipa plant No.1, Arequipa, Peru

Engineering, procurement and construction management (EPCM) for the new QTB Line and Palanquillas overheating kiln.

Source: GMI S.A. Ingenieros Consultores
Lima pasta plant
2014

Construction Management (CM)

Lima pasta plant, Lima, Peru

Work supervision of the Lima pasta plant.

Source: GMI S.A. Ingenieros Consultores
Ancon - Huacho - Pativilca Road Network No.5
2014

Environmental Impact Assessment (EIA)

Ancon - Huacho - Pativilca Road Network No.5, Peru

Environmental Impact Assessment update for Ancon - Huacho - Pativilca Road Network No. 5.

Works executed for Norvial.

Source: GMI S.A. Ingenieros Consultores
Antamina Copper Mine
2014

Conceptual engineering

Antamina Copper Mine, Ancash, Peru

Mine maintenance facilities relocation conceptual engineering.

Source: GMI S.A. Ingenieros Consultores
Yanacocha Gold Mine
2014

Detailed engineering

Yanacocha Gold Mine, Cajamarca, Peru

Detailed engineering of the electromechanical complementary facilities in the gold mill tailings northern expansion

Source: GMI S.A. Ingenieros Consultores
Southern Interoceanic Highway project Peru - Brazil
2014

Environmental Impact Assessment (EIA)

Southern Interoceanic Highway project Peru - Brazil, Peru

Environmental Impact Assessment update for the Southern Interoceanic Highway - Section 1: San Juan de Marcona - Urcos and the Buenos Aires Canchaque Highway.

Works executed for Survial.

Source: GMI S.A. Ingenieros Consultores
Lima pasta plant
2014

Detailed engineering

Lima pasta plant, Lima, Peru

Detailed engineering of Lima pasta plant production line.

Source: GMI S.A. Ingenieros Consultores
Las Bambas Copper Mine
2014

Construction Management (CM)

Las Bambas Copper Mine, Apurímac, Peru

Engineering and construction supervision of Las Bambas mining project truck shop five components.

Source: GMI S.A. Ingenieros Consultores
Multipurpose Callao Port Northern Terminal
2014

Construction Environmental Management

Multipurpose Callao Port Northern Terminal , Peru

Environmental supervision of Port of Callao northern terminal modernization.

Source: GMI S.A. Ingenieros Consultores
Cerro Corona
2014

Detailed engineering

Cerro Corona, Cajamarca, Peru

Detailed engineering for the installation and assembly of 02 Metso mobile crushers.

Source: GMI S.A. Ingenieros Consultores
Mineral concentrates terminal in Callao
2014

Engineering and Design

Mineral concentrates terminal in Callao, Lima, Peru

Engineering of the new mineral recovery system (thickener) that uses water from washed Toromocho mine wagons.

Source: GMI S.A. Ingenieros Consultores
Antapaccay Copper Mine
2014

Construction Management (CM)

Antapaccay Copper Mine, Cusco, Peru

Construction supervision for two circuits of sub-transmission lines.

Source: GMI S.A. Ingenieros Consultores
Trujillo - Chiclayo - Piura - Sullana Highway Autopista del Sol
2014

Definitive studies

Trujillo - Chiclayo - Piura - Sullana Highway Autopista del Sol , Peru

Final engineering study of Reque’s road, between km 768+400 and km 772+200 of Panamericana Norte highway.

Works executed for Corvisol.

Source: GMI S.A. Ingenieros Consultores
Cerro Verde Copper-Molybdenum Mine
2013

Engineering and Design

Cerro Verde Copper-Molybdenum Mine, Arequipa, Peru

Field engineering for fresh and waste water systems construction.

Source: GMI S.A. Ingenieros Consultores
Hilarion mine
2013

Biological monitoring

Hilarion mine, Ancash, Peru

Flora and fauna monitoring, for both terrestrial and aquatic environments, on the area where Hilarion mining projects is developed.

Source: GMI S.A. Ingenieros Consultores
Antamina Copper Mine
2013

Construction Management (CM)

Antamina Copper Mine, Ancash, Peru

Work supervision of the concentrator debottlenecking project.

Source: GMI S.A. Ingenieros Consultores
Antamina Copper Mine
2013

Construction Management (CM)

Antamina Copper Mine, Ancash, Peru

Work supervision of civil works for truck shop concrete slab construction.

Source: GMI S.A. Ingenieros Consultores
Antamina Copper Mine
2013

Detailed engineering

Antamina Copper Mine, Ancash, Peru

Detailed engineering of new concentrate storage tanks.

Source: GMI S.A. Ingenieros Consultores
Antamina Copper Mine
2013

Detailed engineering

Antamina Copper Mine, Ancash, Peru

Detailed engineering for the lid change of the Ball Mill No. 2 discharge side.

Source: GMI S.A. Ingenieros Consultores
La Pampilla refinery
2013

Feasibility studies

La Pampilla refinery, Peru

Feasibility study of the adjustment to new fuel specifications - Pampilla Refinery.

Works executed for GyM.

Source: GMI S.A. Ingenieros Consultores
Antamina Copper Mine
2013

Basic Engineering Design (BED)

Antamina Copper Mine, Ancash, Peru

Conceptual engineering for the trade off study of the tailings pumping system.

Source: GMI S.A. Ingenieros Consultores
Las Bambas Copper Mine
2013

Semi-detailed Environmental Impact Assesment (SDEIA)

Las Bambas Copper Mine, Apurímac, Peru

Modification of the Semi Detailed Environmental Impact Assessment (SDEIA) for the new city of Fuerabamba.

Source: GMI S.A. Ingenieros Consultores
Trujillo - Chiclayo - Piura - Sullana Highway Autopista del Sol
2013

Engineering and Design

Trujillo - Chiclayo - Piura - Sullana Highway Autopista del Sol , Peru

Bridge and road interchanges design in Piura highway.

Works executed for Covisol.

Source: GMI S.A. Ingenieros Consultores
Antamina Copper Mine
2013

Basic Engineering Design (BED)

Antamina Copper Mine, Ancash, Peru

Basic engineering of the pumping system and relocation of water treatment plant (WTP).

Source: GMI S.A. Ingenieros Consultores
Via Expresa Sur
2013

Definitive studies

Via Expresa Sur, Peru

Preliminary and definite study of the Via Expresa Sur.

Works executed for Concesionaria Vía Expresa Sur.

Source: GMI S.A. Ingenieros Consultores
Marcona Iron Mine
2013

Construction Management (CM)

Marcona Iron Mine, Ica, Peru

EPC work supervision for project - First stage operation and process plant expansion.

Source: GMI S.A. Ingenieros Consultores
Antamina Copper Mine
2013

Feasibility studies

Antamina Copper Mine, Ancash, Peru

Feasibility study of the Phase A Truck Shop expansion.

Source: GMI S.A. Ingenieros Consultores
Cajamarquilla Zinc Refinery
2013

Basic Engineering Design (BED)

Cajamarquilla Zinc Refinery, Lima, Peru

Basic engineering (Step V2) as part of the Engineering Framework Agreement signed in mid-2013.

Basic engineering for all automation and control systems

Source: GMI Ingenieros Consultores
OCC Paper plant
2013

Detailed engineering

OCC Paper plant, Peru

Detailed engineering of the OCC Paper Plant.

Source: GMI S.A. Ingenieros Consultores
Camisea gas pipeline
2013

Detailed engineering

Camisea gas pipeline, Peru

Basic and detailed engineering of the Ayacucho section Camisea Pipeline.

Works executed for Compañía Operadora de Gas del Amazonas (Coga).

Source: GMI S.A. Ingenieros Consultores
MP1 Paper Plant
2013

Detailed engineering

MP1 Paper Plant, Peru

Basic and detailed engineering of the MP1 Paper Plant.

Source: GMI S.A. Ingenieros Consultores
Cajamarquilla Zinc Refinery
2013

Detailed engineering

Cajamarquilla Zinc Refinery, Lima, Peru

Detailed engineering (Step V3) as part of the Engineering Framework Agreement signed in mid-2013.

Detailed engineering for: Treatment of manganese dioxide, Area 70 structural assessment, Area 43 SX fire protection system, Area 94 change of compressors, power supply of the new dining room, changing rooms and offices.

Source: GMI Ingenieros Consultores
11.776Engineering man hours (K)
Antamina Copper Mine
2013

Soils & Vegetation Monitoring Program

Antamina Copper Mine, Ancash, Peru

Soil and vegetation monitoring.

Source: GMI S.A. Ingenieros Consultores
Toromocho copper, molybdenum and silver mine
2013

Project control support

Toromocho copper, molybdenum and silver mine, Junin, Peru

Consulting services and project control support for Toromocho mining operation.

Source: GMI S.A. Ingenieros Consultores
Cerro Verde Copper-Molybdenum Mine
2013

Basic Engineering Design (BED)

Cerro Verde Copper-Molybdenum Mine, Arequipa, Peru

Conceptual and basic engineering of the industrial water treatment plants.

Source: GMI S.A. Ingenieros Consultores
Matarani port
2013

Construction Management (CM)

Matarani port, Arequipa, Peru

Construction management of berth F; it includes reception, transport, storage and shipment of Las Bambas, Antapaccay and Cerro Verde mines copper concentrates.

The project includes the reception of ships between 20,000 and 50,000 DWT, a bridge access 168.0m long and 5.0m wide, a pier 261.0m long and 18.4m wide, and a fretwork between 17m and 20m deep.

The project also includes 23 conveyor belts, of which 20 are conventional (total length: 2,165m), 02 are trippers (total length: 345m), and 01 is a pipe conveyor (length: 373m).

Finally, the storage capacity of Xstrata’s warehouse is 100,000 mt, while the storage capacity of Cerro Verde’s warehouse is 150,000 mt.

Source: GMI S.A. Ingenieros Consultores
21.589Engineering man hours (K)
 Longitudinal de la Sierra Highway - Section 2
2013

Conceptual engineering

Longitudinal de la Sierra Highway - Section 2, Peru

Conceptual engineering of the Longitudinal de la Sierra Highway - Section 2.

Works executed for GyM.

Source: GMI S.A. Ingenieros Consultores
Talara Refinery Modernization Project
2013

Construction Management (CM)

Talara Refinery Modernization Project, Peru

Work supervision of 03 production tanks in Talara operations assembly and interconnection.

Source: GMI S.A. Ingenieros Consultores
Block I - Organos
2013

Detailed engineering

Block I - Organos, Piura, Peru

Detailed engineering of the production water injection Plant - Block I.

Works executed for GMP.

Source: GMI S.A. Ingenieros Consultores
Southern Interoceanic Highway project Peru - Brazil
2013

Definitive studies

Southern Interoceanic Highway project Peru - Brazil, Peru

Definitive studies for the construction of the Suaray river bridge, as a replacement of the existing culverts.

Works executed for Survial SA.

Source: GMI S.A. Ingenieros Consultores
Lima pasta plant
2013

Basic Engineering Design (BED)

Lima pasta plant, Lima, Peru

Basic engineering of Lima pasta plant expansion.

Source: GMI S.A. Ingenieros Consultores
Antamina Copper Mine
2013

Basic Engineering Design (BED)

Antamina Copper Mine, Ancash, Peru

Basic engineering of the new recovered water pumping system.

Source: GMI S.A. Ingenieros Consultores
Cerro de Pasco Administrative Economic Unit
2013

Technical report

Cerro de Pasco Administrative Economic Unit, Cerro de Pasco, Peru

Technical file for the landfill in the Pasco mining operation.

Source: GMI S.A. Ingenieros Consultores
Mineral concentrates terminal in Callao
2013

Detailed engineering

Mineral concentrates terminal in Callao, Lima, Peru

Detailed engineering of new washing stations, truck weighing and modifications of the emergency hopper in Callao warehouses.

Source: GMI S.A. Ingenieros Consultores
Ancon - Huacho - Pativilca Road Network No.5
2013

Topographic survey

Ancon - Huacho - Pativilca Road Network No.5, Peru

Topographic services between km 147 and km 204 of Ancon - Huacho - Pativilca Highway.

Works executed for Norvial.

Source: GMI S.A. Ingenieros Consultores
Trujillo - Chiclayo - Piura - Sullana Highway Autopista del Sol
2013

Definitive studies

Trujillo - Chiclayo - Piura - Sullana Highway Autopista del Sol , Peru

Definitive study for the construction of the second highway of Piura’s by pass road, from km 989+000 until km 1002+000 (including 4 bridges).

Works executed for Covisol.

Source: GMI S.A. Ingenieros Consultores
Yanacocha Gold Mine
2013

Detailed engineering

Yanacocha Gold Mine, Cajamarca, Peru

Basic and detailed engineering for the sludge pumps and tanks relocation.

Source: GMI S.A. Ingenieros Consultores
Trujillo - Chiclayo - Piura - Sullana Highway Autopista del Sol
2013

Engineering and Design

Trujillo - Chiclayo - Piura - Sullana Highway Autopista del Sol , Peru

Periodic maintenance study update for the northern panamericana highway, section: Trujillo - Sullana.

Works executed for Covisol.

Source: GMI S.A. Ingenieros Consultores
Antamina Copper Mine
2012

Pre-feasibility studies

Antamina Copper Mine, Ancash, Peru

Pre-feasibility study (Phase A and B) of the expansion of the maintenance and logistics workshop. Phase A has 07 bays and Phase B another 05 bays.

Source: GMI S.A. Ingenieros Consultores
Desvio Imperial - Pampas road
2012

Definitive studies

Desvio Imperial - Pampas road, Huancavelica, Peru

Definitive study for the rehabilitation and improvement of the Imperial Pampas Road.

By agreement No. 018-2012 -MTC/20 given on 24 September 2012, the interagency cooperation agreement between Provías Nacional, Kallpa Corporación, Consorcio Río Mantaro y el Gobierno Regional de Huancavelica was signed for the preparation of the Definitive studies for the rehabilitation and improvement of the Imperial Diversion - Pampas highway.

Under the agreement Kallpa Corporation and Rio Mantaro Consortium hired GMI for the preparation of the study.

Source: GMI S.A. Ingenieros Consultores, Provias Nacional
Talara Refinery Modernization Project
2012

Construction Management (CM)

Talara Refinery Modernization Project, Peru

Work supervision of the assembly and interconnection of 04 operation Talara tanks.

Source: GMI S.A. Ingenieros Consultores
Antamina Copper Mine
2012

Feasibility studies

Antamina Copper Mine, Ancash, Peru

Feasibility study (Phase A) of the expansion of the maintenance and logistics workshop. Phase A has 07 bays.

Source: GMI S.A. Ingenieros Consultores
Antamina Copper Mine
2012

Detailed engineering

Antamina Copper Mine, Ancash, Peru

Detailed engineering of the recreation building and relocation of the new camp warehouse.

Source: GMI S.A. Ingenieros Consultores
Malvinas separation plant
2012

Basic Engineering Design (BED)

Malvinas separation plant, Cusco, Peru

Basic engineering for new flowlines from cluster Pagoreni A to Malvinas plant.

Source: GMI S.A. Ingenieros Consultores
Antamina Copper Mine
2012

Detailed engineering

Antamina Copper Mine, Ancash, Peru

Detailed engineering of used oil mixing station.

Source: GMI S.A. Ingenieros Consultores
Cerro Verde Copper-Molybdenum Mine
2012

Detailed engineering

Cerro Verde Copper-Molybdenum Mine, Arequipa, Peru

Detailed engineering of heavy and light weight equipment gas stations 2 and 3.

Source: GMI S.A. Ingenieros Consultores
Pucusana bridge – Cerro Azul – Ica Road Network No. 6
2012

Detailed engineering

Pucusana bridge – Cerro Azul – Ica Road Network No. 6, Peru

Detailed engineering of the 03 overpasses of the Road Network 6.

Works executed for Concesionaria Vial del Peru (Coviperu)

Source: GMI S.A. Ingenieros Consultores
Toromocho copper, molybdenum and silver mine
2012

Budget and Cost Engineering

Toromocho copper, molybdenum and silver mine, Junin, Peru

Pre-investment and investment studies for the rehabilitation and improvement of Cut Off - Yauli highway.

Source: GMI S.A. Ingenieros Consultores
Water treatment plant
2012

Detailed engineering

Water treatment plant, Peru

Basic and detailed engineering of the water treatment plant as well as re- injection plant.

Source: GMI S.A. Ingenieros Consultores
Pariñas gas processing plant
2012

Detailed engineering

Pariñas gas processing plant, Peru

Detailed engineering of the Pariñas gas processing plant.

Source: GMI S.A. Ingenieros Consultores
Las Bambas Copper Mine
2012

Technical report

Las Bambas Copper Mine, Apurímac, Peru

Technical file for the domestic residual water, as part of the mining project Las Bambas.

Source: GMI S.A. Ingenieros Consultores
Antamina Copper Mine
2012

Detailed engineering

Antamina Copper Mine, Ancash, Peru

Detailed engineering for the 130ktpd debottlenecking project.

Source: GMI S.A. Ingenieros Consultores
Inmaculada Gold and Silver Mine
2012

Detailed engineering

Inmaculada Gold and Silver Mine, Ayacucho, Peru

Detailed engineering, field Engineering, procurement and environmental consulting of the gold and silver mining project Inmaculada for Compañía Minera Suyamarca (Hochschild Group), as part of GyM’s EPC contract.

The detailed engineering for the processing plant included the process, mechanical, piping, civil, structural, architectural, electrical and instrumentation engineering of the crushing area, material transport, stockpile, milling, leaching, upstream decantation, merril crowe and gold plant, tailings detoxification and reagents plant.

It also included the compressed air system, drinking and fire proof water systems, tailings recovery, the low and medium voltage distribution and the backup diesel energy plant. The engineering was developed in a 3D environment using PDMS, and the procurement was done with our own software SisMat.

Source: GMI S.A. Ingenieros Consultores
80.5Engineering man hours (K)
inmaculada2inmaculada1
New industrial plant
2012

Environmental Impact Assessment (EIA)

New industrial plant, Peru

Environmental Impact Assessment (EIA) of the new industrial plant.

Source: GMI S.A. Ingenieros Consultores
Antamina Copper Mine
2012

Detailed engineering

Antamina Copper Mine, Ancash, Peru

Detailed engineering of the service corridor and concentrator plant protection dike.

The project included a service corridor between the Dam D (near the new camp) and the concentrator plant, with a length of 2.4km and a track width of 30m, where small vehicles will travel and pipeline services will be placed (fresh water, mine water, overflow, tailings, high and medium voltage transmission lines and fiber optics).

The design also included 03 platforms that were designed to relocate the existing infrastructure (warehouses, offices, workshops, etc). As part of the engineering development, the transmission lines in high and medium voltage will be carried through a gallery of reinforced concrete on the corridor.

Source: GMI S.A. Ingenieros Consultores
13.453Engineering man hours (K)
Antamina Copper Mine
2012

Pre-feasibility studies

Antamina Copper Mine, Ancash, Peru

Pre-Feasibility study of the service corridor and protection dike of the concentrator plant. The corridor has a length of 1,688m and a width of 13.30m. The corridor includes piping and optic fibre systems, as well as a transmission line. The dike elevation varies between 0 and 70m.

Source: GMI S.A. Ingenieros Consultores
Antamina Copper Mine
2012

Basic Engineering Design (BED)

Antamina Copper Mine, Ancash, Peru

Conceptual engineering for camp alternativas construction.

Source: GMI S.A. Ingenieros Consultores
Antamina Copper Mine
2012

Construction Management (CM)

Antamina Copper Mine, Ancash, Peru

Work supervision for the milling circuits optimization as well as mineral pipeline re-location.

Source: GMI S.A. Ingenieros Consultores
Hospital Daniel Alcides Carrión response capacity improvement
2012

Detailed engineering

Hospital Daniel Alcides Carrión response capacity improvement, Junin, Peru

Detailed engineering for Daniel Alcides Carrion Hospital response capacity improvement.

Works executed for Minera Chinalco Perú S.A.

Source: GMI S.A. Ingenieros Consultores
Cerro Verde Copper-Molybdenum Mine
2012

Detailed engineering

Cerro Verde Copper-Molybdenum Mine, Arequipa, Peru

Detailed engineering to increase by 3% the recuperation capacity of the molybdenum plant. Detailed engineering studies were developed and concluded on August 2012 according to the established schedule and work plan. By that date all the construction drawings and documents were delivered.

Similar to other projects in the mining division, this project included the use of 3D technology in order to integrate the new and existing installations, and assure the appropriate construction according to the engineering design.

Source: GMI S.A. Ingenieros Consultores
20Engineering man hours (K)
Cerro Verde Copper-Molybdenum Mine
2012

Basic Engineering Design (BED)

Cerro Verde Copper-Molybdenum Mine, Arequipa, Peru

Basic and detailed engineering to increase by 3% the recuperation capacity of the molybdenum plant. The basic engineering started in March 2012 and was successfully completed with the modifications of the existing plant, the investment estimate (CAPEX) and the documents required for the procurement of the main equipment.

Similar to other projects in the mining division, this project included the use of 3D technology in order to integrate the new and existing installations, and assure the appropriate construction according to the engineering design.

Source: GMI S.A. Ingenieros Consultores
Constancia Copper Mine
2011

Engineering, procurement and construction management (EPCM)

Constancia Copper Mine, Cusco, Peru

Engineering, Procurement and Construction Management (EPCM ) of the mining camps at Constancia Project. Fortunia operation camps were designed and built for 500 people, Fortunia construction camps was designed and built for 2,500 people.

Source: GMI S.A. Ingenieros Consultores
182.229Engineering man hours (K)
Cajamarquilla Zinc Refinery
2011

Detailed engineering

Cajamarquilla Zinc Refinery, Lima, Peru

Basic and detailed engineering for the 5,000 ton storage capacity clinker silo, as well as the clinker pneumatic discharge system up to the entry of the 4 day bins. This pneumatic system represents an alternative to the existing mechanical redlers system. The clinker is received from the roaster by 2 bucket elevators which discharge into the Redlers.

A new discharge towards the entrance of clinker Silo 3 was implemented from the discharge of one of the redlers.

Source: GMI S.A. Ingenieros Consultores
7.806Engineering man hours (K)
Cerro Verde Copper-Molybdenum Mine
2011

Detailed engineering

Cerro Verde Copper-Molybdenum Mine, Arequipa, Peru

Detailed engineering of the new treatment plant, fresh water supply and corresponding pumping stations for Arequipa residual water interception and conduction systems.

Within the Cerro Verde mining complex, the design included the tailing conduction and distribution from the new concentrator plant towards the tailing dam, the reclaim tailing water system, and the reclaim dam seepage water system, as part of the water supply for the new concentrator plant.

Source: GMI S.A. Ingenieros Consultores
278.69Engineering man hours (K)
Antamina Copper Mine
2011

Detailed engineering

Antamina Copper Mine, Ancash, Peru

Conceptual, basic and detailed engineering to increase the storage capacity of perforation samples.

Between 2012 and 2016, Antamina is conducting an exploration campaign that will require storage of 120,000m of drilling samples per year. GMI was hired to develop the conceptual, basic and detail Engineering of the 7 and 8 zones, located at the south of the current core shack platform in the Yanacancha camp.

The detailed engineering studies optimized the drainage designs presented in the basic engineering with the development of more economical technical solutions. In addition, an improvement was made on the accuracy of the material take off (MTO) and earthworks quantifications, drainage works, concrete works, metal structures, supply and improved electrical connections.

Earthwork MTO was updated with the survey data of the soil mechanics report, as well as the development of construction plans with the necessary detail to minimize the technical queries and modifications to be made during the work execution.

With all these adjustments it was possible to update the project CAPEX with a level of accuracy of +/-10%.

Source: GMI Ingenieros Consultores
4.843Engineering man hours (K)
Mineral concentrates terminal in Callao
2011

Detailed engineering

Mineral concentrates terminal in Callao, Lima, Peru

Detailed engineering and procurement for the expansion and modernization of the warehouses and mineral handling systems, including reception, storage and dispatch.

The main warehouse (Cormin I) was increase from 80 to 110 ton capacity and two additional industrial buildings were designed. Also, a total of 11 transportation belts were designed, 9 of them conventional for a total of 1,400 meters and 2 of them pipe conveyors for a total of 250 meters.

The project included a new administration building, maintenance workshops, internal vehicle roads, electric supply for the operation of the new installations and the control systems.

Source: GMI S.A. Ingenieros Consultores
72.331Engineering man hours (K)
Antamina Copper Mine
2010

Detailed engineering

Antamina Copper Mine, Ancash, Peru

Detail engineering of seepage pumping line relocation.

Due to the steady expansion of the tailings dam, the seepage pumping system needed a change that covered the required flow rates. To do so, the system was moved out of the future projection of the tunnel decant extension.

The modified system corresponds to the facilities from the seepage pumping station, up to the booster station, and the development of complementary works for the relocation of pipelines and accessories required for a proper future operation.
8.744Engineering man hours (K)
Cerro Verde Copper-Molybdenum Mine
2009

Detailed engineering

Cerro Verde Copper-Molybdenum Mine, Arequipa, Peru

The second stage was developed between September 2009 and February 2010, Construction commenced in March 2010 and was successfully completed in October 2010.

In this project, the use of 3D technology was the key to develop a quality product since interferences were detected on time and appropiate actions for constructability were defined.

Source: GMI S.A. Ingenieros Consultores
29Engineering man hours (K)
Marcona Iron Mine
2009

Detailed engineering

Marcona Iron Mine, Ica, Peru

Basic and detail engineering of magnetic plant as well as filtration plant Line 9 as part of the production increase from 8 to 10 million tons per year.

Magnetic plant design included a new ball mill with a 5.03m diameter and 4,830HP as well as 06 flotation cells with a capacity of 30m3 each. The filtration plant had the following dimensions: 49.5m x 7.0m x 16.5m.

The design included 4 filters of 10'6"as well as a total of 5 pumps.

Source: GMI S.A. Ingenieros Consultores
25.022Engineering man hours (K)
Marcona Iron Mine
2009

Construction Management (CM)

Marcona Iron Mine, Ica, Peru

Construction supervision of new stocks and transfer systems for iron ore shipment Phases II, III and IV, as well as additional works.

The project included storage expansion and the transportation of bulk ore from the new stocks to the shipment. The transfer system capacity was increased from 4,000 to 6,600 tph.

Source: GMI S.A. Ingenieros Consultores
19.611Engineering man hours (K)
Antamina Copper Mine
2008

Detailed engineering

Antamina Copper Mine, Ancash, Peru

Conceptual and Detailed Engineering for the construction of the By-Pass to the Main SAG Mill in the Grinding Area. The role of the By-Pass is to Transport, Grind, and Classify the Mineral in such a way that it allows the SAG Mill to stop working without the need to halt the plant operation.

The By-Pass has a Processing Capacity of 4.750 Metric Tons Per Hour and consists of a new Conical Crusher, Three New Conveyor Belts, Three Modified Existing Conveyor Belts, a Dosing Tripper, One Screen for Moist Material and Two Screens for Dry Material. Engineering was developed in a 3D environment using PDMS.

Source: GMI S.A. Ingenieros Consultores
32.659Engineering man hours (K)
Marcona Iron Mine
2008

Construction Management (CM)

Marcona Iron Mine, Ica, Peru

GMI supervised project portfolio to: Increase the iron concentrate from 8 to 10 million tonnes per year, expand its storage capacity and bulk mineral transport from the new stocks to the shipping area, increase and maximize its existing installations. A Conservation Plan was also developed.

This supervision services included: "The Line 9 Improvement Project in the Magnetic Plant, the Implementation of the New Filtration Plant", and "The 9th Milling Line Improvement, for the increase in production from 8 to 10 million Tonnes per year.

"The New Stocks and Transfer Systems for Iron mineral shipment – Phases II, III and IV, as well as complementary works" to increase the mineral shipping from 4000 to 6600 TPH.

Source: GMI S.A. Ingenieros Consultores
42.564Engineering man hours (K)
Sulfuric Acid Plant for the Copper Circuit
2008

Detailed engineering

Sulfuric Acid Plant for the Copper Circuit, Junin, Peru

GMI developed the Detailed Engineering of the Sulfuric Acid Plant for the Copper Circuit. The design of the Gas Cleaning process was carried out by Fleck Chemical Industries Inc. (FCII) and the design of the producing sulfuric acid process was carried out by Aker Kvarner Chemetics (AKC). GMI completed the engineering work for this project in July 2009.

Additionally, DRP hired GMI to perform Material and Equipment Management Services for all their PAMA and Modernization projects. These services started in April 2007 and were successfully completed in December 2008.

Source: GMI S.A. Ingenieros Consultores
25.611Engineering man hours (K)
Toromocho copper, molybdenum and silver mine
2008

Construction Management (CM)

Toromocho copper, molybdenum and silver mine, Junin, Peru

Construction management of Kingsmill tunnel acid water treatment plant.

The Kingsmill tunnel was built in 1934 to drain tailings from mining operations in Morococha and it has two objectives: Yauli river decontamination and viability of the Toromocho mining project.

The HDS (High Density Sludge) process was selected for the water treatment because it represents the best conventional technology available to produce a high quality effluent and minimum volumes of chemically stable sludge at the lowest possible cost.

The plant is at 4,200 masl on the river bank, opposite to the tunnel intake. It has a 68m diameter clarifier, feed tanks and reactors, lime silo and a whitewash tank, located next to a building that will house a lime system, the replacement system of the flocculants polymer dry storage, compressors and blowers, maintenance area and spare parts, electrical control room and the laboratory area, offices and services.

Source: GMI S.A. Ingenieros Consultores
30.782Engineering man hours (K)
Cerro Verde Copper-Molybdenum Mine
2008

Detailed engineering

Cerro Verde Copper-Molybdenum Mine, Arequipa, Peru

Sociedad Minera Cerro Verde S.A.A., planned to increase the nominal production of the process of its Concentrator Plant from 108K MTPD to 120K MTPD.

Fluor Daniel evaluated the different processes of the plant and identified the critical points that turned into “bottlenecks” for an increase in production. Within the framework of the “Debottlenecking ” Project, GMI S.A. was asked to develop the detailed engineering.

The service was developed in two stages: The first was mainly carried out at the facilities of Cerro Verde in Arequipa from May 2008 to February 2009.

Source: GMI S.A. Ingenieros Consultores
42Engineering man hours (K)
Yanacocha Gold Mine
2007

Detailed engineering

Yanacocha Gold Mine, Cajamarca, Peru

Basic and Detailed Engineering Project Cost Estimates and Technical Evaluations for the Purchase of Equipment for the Acid Water Treatment Plants (AWTP) at La Quinua and Pampa Larga for Minera Yanacocha.

The plants are located at an altitude of 4,000 masl., with temperatures between 0°C and 22° C and winds up to 120 km/hr. The AWTP Plants regulate the pH levels and remove heavy metals before being discharged to the environment. Before treatment, water contains the following metals: Aluminnum, Manganese, Iron and lower concentrations of Copper and Zinc.

The engineering design included an Acid Walter Intake, a collection and Transport System, Clarifier Tanks, a Sludge Clarifier System, a Chemical Dosing System and Transfer Pumps. Engineering was developed in a 3D environment using PDMS.

Source: GMI S.A. Ingenieros Consultores
39.275Engineering man hours (K)
Sulfuric Acid Plant for the Copper Circuit
2006

Detailed engineering

Sulfuric Acid Plant for the Copper Circuit, Junin, Peru

For this Project Doe Run Peru (DRP) hired the Services of the Canadian Company Fleck Chemical Industries Inc. (FCII), which was responsible for the Basic Engineering of the Lead Circuit Acid Plant and the Design and Selection of Process Equipment.

GMI was responsible for the Detailed Engineering Work Services Outside the Contract Limits of the DRP and FCII contract. This included Preliminary Engineering Works and Auxiliary Systems.

The Sulfuric Acid Plant for Lead Circuit began Operations in late September 2008.

Source: GMI S.A. Ingenieros Consultores
34.02Engineering man hours (K)

More projects, Company brochure, contact details and site photos are all included in the PDF.

Snapshot

Company Url
Sector
Construction & Engineering Sub-Industry
Recorded Contracts
148

Services

Detailed engineering
Construction Management (CM)
Basic Engineering Design (BED)
Definitive studies
Engineering and Design