Antamina Copper Mine

Antamina Copper Mine

Antamina is a polymetallic mining complex that produces copper, zinc and molybdenum concentrates.

The mine is located in north-central Peru, approximately 100 km east of Huaraz, at an elevation of 4,100 m. The main facilities consist of an open pit copper-zinc mine with rock waste dumps, a processing concentrator, and a tailings impoundment. Associated facilities include a 302 km-long concentrate pipeline and a concentrate dewatering and ship loading facility located at Puerto Punta Lobitos near Huarmey.

The mine will cease primary production in 2019 and the long-term stockpiles will be depleted in 2022.

Antamina Mine Concentrator Process Diagram

Milestones

  • 2011

    Modification of EIA approved

  • 2002

    EPC development of the Antamina Concentrate Export Terminal

  • 2001

    EPCM

Engineering and Design

Geoservice Ingeniería

Review, update and optimization of Huarco Curán pipeline irrigation system technical file.

Source: Geoservice Ingeniería

Construction Management (CM)

GMI Ingenieros Consultores

Construction management for inert dump grinding system, service road corridor and re-location of the electric room.

Source: GMI Ingenieros Consultores

Technical report

Geoservice Ingeniería

Optimization of existing technical files and design of Huarco Curan tailing dam complementary works project.

Source: Geoservice Ingeniería

Detailed engineering

GMI Ingenieros Consultores

Services Corridor Phase I detailed engineering.

Source: GMI S.A. Ingenieros Consultores

Basic Engineering Design (BED)

GMI Ingenieros Consultores

Basic engineering of the north side temporary tailings pumping system and south side tailings pipeline extension.

Works executed for Fluor.

Source: GMI S.A. Ingenieros Consultores

Detailed engineering

Anddes Asociados

Detailed engineering Platform Point E.

Source: Anddes Asociados

Conceptual engineering

GMI Ingenieros Consultores

Mine maintenance facilities relocation conceptual engineering.

Source: GMI S.A. Ingenieros Consultores
FLSmidth  Minerals
2014

Mill Inspection

FLSmidth Minerals

Construction Management (CM)

GMI Ingenieros Consultores

Work supervision of the concentrator debottlenecking project.

Source: GMI S.A. Ingenieros Consultores

Construction Management (CM)

GMI Ingenieros Consultores

Work supervision of civil works for truck shop concrete slab construction.

Source: GMI S.A. Ingenieros Consultores

Detailed engineering

GMI Ingenieros Consultores

Detailed engineering for the lid change of the Ball Mill No. 2 discharge side.

Source: GMI S.A. Ingenieros Consultores

Detailed engineering

GMI Ingenieros Consultores

Detailed engineering of new concentrate storage tanks.

Source: GMI S.A. Ingenieros Consultores

Circuit board repair

GTO Peru

Repair and maintenance of electronic components including Komatsu truck cards and Letornau front loader cards.

Repaired Komatsu cards: DID panel, 17FB173 card, 17FB179 card, AID card, backplane 930.

Repaired Letornau front loader cards: Amplifier Blocking card, Power Supply 4172841-06 cards, Prime GNS 4247220-02 card, Limit AC Command 4245106-02 card, Trigger signal 4227010-03 card, VR Interface 4255720-01 card, Interface card AC/FC 4255722-04 card, VR Control 4239704-02 card.

Source: GTO Peru

Basic Engineering Design (BED)

GMI Ingenieros Consultores

Conceptual engineering for the trade off study of the tailings pumping system.

Source: GMI S.A. Ingenieros Consultores

Basic Engineering Design (BED)

GMI Ingenieros Consultores

Basic engineering of the pumping system and relocation of water treatment plant (WTP).

Source: GMI S.A. Ingenieros Consultores

Feasibility studies

GMI Ingenieros Consultores

Feasibility study of the Phase A Truck Shop expansion.

Source: GMI S.A. Ingenieros Consultores

Soils & Vegetation Monitoring Program

Ecología y Tecnología Ambiental (Ecotec)

The Soil and Vegetation Monitoring Program periodically evaluates the soil and vegetable tissues of related plants, especially those for agricultural use, in order to determine the presence of metals.

The work consisted of simultaneous field sampling of soils, cultivated plants and wild forage tissues. The sampling was performed according to the 02 major drainage basins and dispersal potential and based on its relationship with specific components of the operation. The preparation and preservation of samples was performed according to the best practices of custody chain, refrigeration and transportation. The samples were analyzed by an accredited testing laboratory, following exact analytical and calibration procedures.

The results obtained for soil and plant tissues were tested with reference values established by the program and derivatives of international sources. In the case of soils, for the first time they were compared with national soil quality standards.

The final analysis included a special and temporal approach, including the integration of information generated during the previous monitoring, weather data, air and water quality, among others. The results provided valuable information that indicates not only the state of the soils and associated vegetation, especially in the crops area near to the exploitation area; but they are also useful as an environmental indicator for the mine’s surrounding conditions.

Source: Ecotec
0.784Engineering man hours (K)

Geotechnical studies

Anddes Asociados

Geotechnical studies for foundations and slope stability for the pre-feasibility Optimization Program Production (OPP) project. The following areas are included: Port, concentrator plant, emergency pond thickeners, tailings thickeners, main pumping station, truck shop, construction camp 4500, crusher Quebrada Antamina, system of conveyor belts and ore and waste transportation tunnel, crusher Slot Botadero Este, system of conveyors Slot Botadero Este, tailings pumping stations , pipelines tailings among others.

Design of the haul road to the tailings dam, Tucush option. Soil study for foundation in the camp PPL. Geotechnical studies for Platform Point E construction. Geotechnical studies for foundation of tanks concentration storage.

Source: Anddes Asociados

Soils & Vegetation Monitoring Program

GMI Ingenieros Consultores

Soil and vegetation monitoring.

Source: GMI S.A. Ingenieros Consultores
Golder Associates Perú S.A.
2013

Tailing dam design

Golder Associates Perú S.A.

Golder Associates had an ongoing role as the Engineer of Record for the design and construction of the tailings dam which had an ultimate height of over 240 metres. The tailing dam will be one of the highest embankments in the world.

Associated work included a water supply dam, three 3.5-m horseshoe section drill and blast tunnels, three concrete tunnel plugs and two sidehill decant structures, the design of tailings distribution systems, tailings management planning, ongoing geochemical studies, surface water management, and the development of operation, maintenance and surveillance plans and emergency response plans.

Source: Golder Associates Perú S.A.
240Height (m)
Klohn Crippen Berger
2013

Integrated Development Plan

Klohn Crippen Berger

Closure plan preparation included assessing works, physical and geochemical stability for the open pit, waste dumps, tailings, low grade and marginal grade stockpile areas. Closure plans were also prepared for the concentrator, mine site and port facilities, pipelines, valve stations and power lines.

Klohn Crippen Berger (KCB) developed a progressive reclamation program as well as environmental management plans following closure. KCB designed and constructed an engineered wetland at 4000 m elevation and sediment and water treatment ponds for runoff from the mine waste rock dumps. Cost estimates and closure schedule were developed for progressive reclamation, closure works, engineering, inspections and permits, as well as long term operations and maintenance.

Source: Klohn Crippen Berger (KCB)

Basic Engineering Design (BED)

GMI Ingenieros Consultores

Basic engineering of the new recovered water pumping system.

Source: GMI S.A. Ingenieros Consultores
FLSmidth  Minerals
2013

Mill Repairs

FLSmidth Minerals

Pre-feasibility studies

GMI Ingenieros Consultores

Pre-feasibility study (Phase A and B) of the expansion of the maintenance and logistics workshop. Phase A has 07 bays and Phase B another 05 bays.

Source: GMI S.A. Ingenieros Consultores

Feasibility studies

GMI Ingenieros Consultores

Feasibility study (Phase A) of the expansion of the maintenance and logistics workshop. Phase A has 07 bays.

Source: GMI S.A. Ingenieros Consultores

Detailed engineering

GMI Ingenieros Consultores

Detailed engineering of the recreation building and relocation of the new camp warehouse.

Source: GMI S.A. Ingenieros Consultores

Detailed engineering

GMI Ingenieros Consultores

Detailed engineering of used oil mixing station.

Source: GMI S.A. Ingenieros Consultores
TDM Peru
2012
US$ 3.5M

Civil, structural and mechanical frameworks

TDM Peru

TDM built a system that acts as an efficient and safe protection for Antamina Primary Crusher against landslides of rocks and other materials.

The solution used Geobrugg Dynamic Barriers, systems that are composed of flexible and rigid elements that have the capacity to absorb an energy of 3000 KJ, caused by the impact of stones or other materials arising from considerable heights.

TDM installed a complete system of Geobrugg RX-150 adapted to the characteristics required.

Source: TDM

Detailed engineering

GMI Ingenieros Consultores

Detailed engineering for the 130ktpd debottlenecking project.

Source: GMI S.A. Ingenieros Consultores

Geotechnical studies

Anddes Asociados

Geotechnical study of pipeline protection and industrial water pipe in different locations of haul road crossing at Botadero East.

Geotechnical study of Zones 7 and 8 for the construction of the core shack as well as in the relocation area of the new pipeline tracing. Geotechnical study at 3 different pipeline haul road crossings in the south area of Botadero East.

Source: Anddes Asociados

Detailed engineering

GMI Ingenieros Consultores

Detailed engineering of the service corridor and concentrator plant protection dike.

The project included a service corridor between the Dam D (near the new camp) and the concentrator plant, with a length of 2.4km and a track width of 30m, where small vehicles will travel and pipeline services will be placed (fresh water, mine water, overflow, tailings, high and medium voltage transmission lines and fiber optics).

The design also included 03 platforms that were designed to relocate the existing infrastructure (warehouses, offices, workshops, etc). As part of the engineering development, the transmission lines in high and medium voltage will be carried through a gallery of reinforced concrete on the corridor.

Source: GMI S.A. Ingenieros Consultores
13.453Engineering man hours (K)

Pre-feasibility studies

GMI Ingenieros Consultores

Pre-Feasibility study of the service corridor and protection dike of the concentrator plant. The corridor has a length of 1,688m and a width of 13.30m. The corridor includes piping and optic fibre systems, as well as a transmission line. The dike elevation varies between 0 and 70m.

Source: GMI S.A. Ingenieros Consultores

Basic Engineering Design (BED)

GMI Ingenieros Consultores

Conceptual engineering for camp alternativas construction.

Source: GMI S.A. Ingenieros Consultores

Construction Management (CM)

GMI Ingenieros Consultores

Work supervision for the milling circuits optimization as well as mineral pipeline re-location.

Source: GMI S.A. Ingenieros Consultores
Inspectra SA
2012
US$ 73.2K

Engineering and Design

Inspectra SA

Inspectra was in charge of truck shop lube storage and dispense systems etailed design.

Source: Inspectra
Cosapi Ingeniería y Construcción
2011
US$ 96.5M

Tunnel construction

Cosapi Ingeniería y Construcción

The project consists of extending the tunnel Decant a length of 70m, in order to execute these tasks, water coming through the UCDC and entering the tunnel has to be diverted.

The project also includes the installation of a new pumping pipeline from Collection pumping station to the Booster station, station that shall be protected using a reinforced concrete pipeline.

Source: Cosapi Ingeniería y Construcción
0.070Length (km)

Geotechnical studies

Anddes Asociados

Geotechnical investigations for Botadero East expansion project. Geotechnical studies of foundation for mobile faucets.

Source: Anddes Asociados

Detailed engineering

GMI Ingenieros Consultores

Conceptual, basic and detailed engineering to increase the storage capacity of perforation samples.

Between 2012 and 2016, Antamina is conducting an exploration campaign that will require storage of 120,000m of drilling samples per year. GMI was hired to develop the conceptual, basic and detail Engineering of the 7 and 8 zones, located at the south of the current core shack platform in the Yanacancha camp.

The detailed engineering studies optimized the drainage designs presented in the basic engineering with the development of more economical technical solutions. In addition, an improvement was made on the accuracy of the material take off (MTO) and earthworks quantifications, drainage works, concrete works, metal structures, supply and improved electrical connections.

Earthwork MTO was updated with the survey data of the soil mechanics report, as well as the development of construction plans with the necessary detail to minimize the technical queries and modifications to be made during the work execution.

With all these adjustments it was possible to update the project CAPEX with a level of accuracy of +/-10%.

Source: GMI Ingenieros Consultores
4.843Engineering man hours (K)
FLSmidth  Minerals
2011

Mill Repairs

FLSmidth Minerals

Alignment of Gear System in shutdown

Detailed engineering

GMI Ingenieros Consultores

Detail engineering of seepage pumping line relocation.

Due to the steady expansion of the tailings dam, the seepage pumping system needed a change that covered the required flow rates. To do so, the system was moved out of the future projection of the tunnel decant extension.

The modified system corresponds to the facilities from the seepage pumping station, up to the booster station, and the development of complementary works for the relocation of pipelines and accessories required for a proper future operation.
8.744Engineering man hours (K)
Klohn Crippen Berger
2010
US$ 160.7K

Environmental Impact Assessment (EIA)

Klohn Crippen Berger

The modification of the Antamina project EIA by increasing reserves and mine plan optimisation has as main objectives incorporate changes in the mine plan due to the increase of reserves declared in 2008, 745millones metric tons, and facilitate an increase in the rate of ore processing by optimising the production process.

The average rate of ore processing will increase by 25 % from 104,000 to 130,000 tonnes per day (tpd) on average with maximum outputs up to 175,000 tpd. These amendments extend the lifetime of the mine until 2028 .

According to directorial resolution Nº054-2011-MEM/AAM given on February 18th 2011, the Antamina project Modification of Environmental Impact Assessment for increasing reserves and mine plan optimisation was approved by the Peruvian Ministry of Energy and Mines meeting the technical requirements by environmental local regulations.

Source: Peruvian Ministry of Energy and Mines
SSK
2010
US$ 394.1K

Construction Management (CM)

SSK

The project comprised the expansion of the Truck Workshop which is going to meet the new maintenance requirements due to the increase of the fleet of mining development vehicles, resulting from the greater processing capacity of the plant.

The extent of the work included Engineering, Procurement and Construction of the new Truck Workshop in the area adjacent to the existing workshop. Engineering, supply and construction of the following facilities truck bays, welding workshop, compressors yard, among the main ones were executed.

Source: SSK

Concentration and processing plant construction

GyM

Mechanical assembly of the new facilities of the concentrator plant for a capacity expansion from 90,000 to 130,000 t/day. Included upgrading the plate feeder of the primary crusher, coarse ore circuit, grinding (one SAG mill and one ball mill), flotation, regrinding, concentrate thickener, bismuth plant, reagents and facilities for the concentrate. Associated works.

Source: GyM
130000Output Tonnes per day1Number of SAG Mill installed 1Number of Ball Mill installed
Cosapi Ingeniería y Construcción
2009
US$ 3.5M

Civil, structural and mechanical frameworks

Cosapi Ingeniería y Construcción

In order to maintain production plant, during the SAG mill shutdown to change its stator, Minera Antamina devised an alternative system that would set a By Pass to the grinding process, deriving flow of SAG mill to feed directly into ball mills.

The Bypass passes through three specific areas, tripper, vibrating equipments and crusher and grinding area. Its realization demanded the execution of civil, mechanical, electrical and instrumentation works. The main equipments set were two vibrating screens, a cone crusher and three conveyor belts.

Source: Cosapi Ingeniería y Construcción

Detailed engineering

GMI Ingenieros Consultores

Conceptual and Detailed Engineering for the construction of the By-Pass to the Main SAG Mill in the Grinding Area. The role of the By-Pass is to Transport, Grind, and Classify the Mineral in such a way that it allows the SAG Mill to stop working without the need to halt the plant operation.

The By-Pass has a Processing Capacity of 4.750 Metric Tons Per Hour and consists of a new Conical Crusher, Three New Conveyor Belts, Three Modified Existing Conveyor Belts, a Dosing Tripper, One Screen for Moist Material and Two Screens for Dry Material. Engineering was developed in a 3D environment using PDMS.

Source: GMI S.A. Ingenieros Consultores
32.659Engineering man hours (K)
ABB
US$ 2.1M

Gearless Mill Drive systems (GMDs)

ABB

ABB provided four complete Gearless Mill Drive systems (One SAG Mill and 3 Ball Mill Drive Systems) both mills with Capacities of 1000 t/h.

The Gearless Mill Drive systems include Wrap-around Motors, Cycloconverters & Excitations, Transformers, E-House Containers with respective Cycloconverters, MCC’s, PLC’s, VMS, Excitation Converters, Fire Fighting, UPS.

Source: ABB
20100Mill rated power (KW)9.23RPM
Ausenco Limited
US$ 134.2M

Engineering, Procurement and Construction (EPC)

Ausenco Limited

Ausenco executed an EPC development of the Antamina Concentrate Export Terminal at Huarmey, Peru.

The terminal is capable of exporting 1,800,000 t of copper and zinc concentrates annually. Facilities include receiving tanks for the slurry, treatment facilities, storage shed for 150,000 t of concentrate, conveyors from the filter plant to the storage building and from the storage building to the ships, berth for ships up to 50,000 DWT and associated infrastructure.

Source: Ausenco

Engineering, procurement and construction management (EPCM)

Cosapi Ingeniería y Construcción

The project included the engineering, procurement and construction management of the following works in the Antamina mining complex:

A Permanent camp for 5,000 people, a concentrator plant of 70,000 tons/day, tailings dam 232 m high, Conococha - Yanacancha road (120 km), transmission line 220 KV (60 km), 300 km pipeline from Yanacancha to Huarmey, port to export Huarmey concentrates.

The project used 15 million direct man-hours in construction and 5,000 people at the peak of work.

Source: Cosapi Ingeniería y Construcción
70000Daily Ore Input tn/day15Man-Hours (Million)2300Project Capital ($mil)
Bechtel
US$ 51.7M

Copper Concentrator

Bechtel

Bechtel has completed services for the Antamina copper project under budget and more than two months ahead of schedule.

The project, on the remote eastern slope of the Andes, included the world’s largest grassroots, single-line copper, zinc, and molybdenum concentrator; the world’s largest concrete-faced rockfill tailings dam; a cross-country slurry pipeline; new mountain roads; a port with a filter plant and marine terminal; and other facilities. Bechtel began the project for a customer consortium in 1998.

Source: Bechtel Corporation
Tecno Fast

Camps and field offices development

Tecno Fast

With an average lifespan of about 23 years in the province of Huari, about 200 km. city ​​of Huaraz in Ancash region is the mining complex that produces copper, zinc and molybdenum and silver and lead products. The camp consists of 24 buildings, highlighting the modern resort staff accommodation; plus a unique concentrator plant of its kind, equipped with technology that allows to process ore mined pit great complexity.
5000People Capacity

More contracts, contractors and photos are included in the PDF.

Snapshot

Capital Expenditure
US$ 2.3B
Project Status
Producción
Metal Annual Output (Tonnes)
461000
Mine Type
Open Pit
Mineral reserves (Million Tonnes)
454
Metals mined
Copper, zinc and molybdenum
Life of Mine LoM (Years)
15
Type of Ore Body
Pyrometasomatic
Copper Mineral Reserves
1.05%
Molybdenum Mineral Reserves
0.031%
Zinc Mineral Reserves
0.17%
Cease of production
December 2019
legal.unidad
ANTAMINA

Top Contractors

Cosapi Ingeniería y Construcción
Ausenco Limited
Santo Domingo Contratistas Generales S.A.
Bechtel
GMI Ingenieros Consultores