Austria Duvaz Morococha copper mine

Austria Duvaz Morococha copper mine

The copper mining project of Sociedad Minera Austria Duvaz, is located in the central part of the Andes in Morococha mining district, Yauli, Junín, Peru at an altitude of between 4,300 and 4,500 meters above sea level.

The ore is treated by a conventional differential flotation process in a plant with a treatment capacity of 800 tpd with an expansion projection to 1000 tpd in the short term. The recovery process is by selective and differential flotation, initially floating a lead-copper bulk concentrate to later being separated into two commercial concentrates.

Milestones

  • 2012

    Mine closure plan update approval

  • 2012

    Austria Duvaz EIA project approval

  • 2009

    Mine closure plan approval

Construction Management (CM)

Geoservice Ingeniería

Construction supervision of west lateral expansion stage II at Puquiococha tailings deposit.

Source: Geoservice Ingeniería
geoservice-austria-duvaz3geoservice-austria-duvaz2geoservice-austria-duvaz1
Brynajom
2013
US$ 556.7K

Tailing dam construction

Brynajom

Regrowth of western section of the Puquiococha tailing dam.

Source: Brynajom
Brynajom
2013
US$ 949K

Tailing dam construction

Brynajom

West lateral expansion the Puquiococha tailing dam Stage I.

Source: Brynajom
96768Storage Capacity (Mt)69120Tank Capacity (m3)
SVS Ingenieros
2012
US$ 84K

Closure plan preparation

SVS Ingenieros

As part of this update of Mine Closure Plan (MCP); citizen participation mechanisms were applied in order to capture the views and expectations of the community area of ​​influence of mining operations and to establish the possible social implications that may arise due to mining closure activities .

The components of the MCP considered 03 Bocaminas (Polvorin, Oswaldo Cuadro, Carlos Reynaldo), 01 deposit tailings (Puquiococha), 01 landfill, 08 infrastructure (concentration plant, general wharehouse, among others) and 01 access.

According to directorial resolution Nº384-2012-MEM/AAM given on Nov 22nd 2012, the mine closure plan update for Austria Duvaz unit was approved meeting the technical requirements for the Peruvian Ministry of Energy and Mines.

Source: Peruvian Ministry of Energy and Mines
Proyectos y Estudios Mineros S.A.C
2012
US$ 213.3K

Basic Engineering Design (BED)

Proyectos y Estudios Mineros S.A.C

Development of conceptual engineering at 600 tpd. Provide a project plan to Austria Duvaz with the necessary technical specifications to enhance the continuous assurance processes.

Parts of the study include: Master plan that will allow proper planning operations in the coming years. Check, amendments and preparation of plans at the level of conceptual and basic engineering in order to build a pike. Geology, resources and reserves studies. Medium-term planning. Filling hydraulic study. OPEX - CAPEX as well as economic analysis.

Source: Proyectos y Estudios Mineros
Viceversa Consulting
2010
US$ 160.7K

Environmental Impact Assessment (EIA)

Viceversa Consulting

The EIA was conducted in order to comply with the company reserve plan, Austria Duvaz needed to make changes to the production process of concentrates as well as tailings disposal for years from 2011 to 2016, ensuring therefore the life of the mine; the following components were implemented:

Expanding the capacity of the Puquiococha concentrator plant from 450 to 800 tonnes/day. Regrowth of the western sector of the Puquiococha tailings dam, final geometry from level 4,515 to 4,528 meters above sea level.

According to directorial resolution Nº081-2012-MEM/AAM given on March 16th 2012, the Austria Duvaz EIA study was approved meeting the technical requirements for the Peruvian Ministry of Energy and Mines and the environmental local regulations.

Source: Peruvian Ministry of Energy and Mines
Consorcio Metalúrgico SA (Comesa)
2008
US$ 5.4M

Ball Mill

Consorcio Metalúrgico SA (Comesa)

This mill receives mineral from hopper No. 5, it works also as primary mill and unlike the rod mill, the grinding elements used are steel balls of 1, 2 and 4 inches of diameter feeding almost 50% of the ball mill capacity.

Source: Peruvian Ministry of Energy and Mines
880RPM6Mill diameter (ft)134.22Rated power (KW)6Mill Length (ft)
Consorcio Metalúrgico SA (Comesa)
2008

Rod Mill

Consorcio Metalúrgico SA (Comesa)

Rod mill which function is to grind the ore to an appropriate minimum size for flotation, this is the final stage of size reduction.

The rod mill, used as a primary mill, basically consists of a horizontal rotating cylindrical drum loaded at 50% of its volume approximately with steel bars, this cylindrical drum is continuously fed by the ore coming from the crushing process as well as enough water to form the mass of ore.

Source: Peruvian Ministry of Energy and Mines
149.13Mill rated power (KW)1186RPM6Mill diameter (ft)12Mill Length (ft)
Cesel Ingenieros
2006
US$ 84K

Closure plan preparation

Cesel Ingenieros

The implementation of the Mine Closure Plan (MCP) aims that the environment surrounding the mining unit recovers a condition of similar quality to the one IT had before the start of mining operations considering human health, safety, physical stability, geochemical stability, use of surface land.

The components of the MCP considered are 07 bocaminas, 01 tailings deposit, 01 landfill, 08 infrastructures and 01 access.

According to directorial resolution Nº195-2009-MEM/AAM given on July 3rd 2009, the mine closure plan for Austria Duvaz unit was approved meeting the technical requirements for the Peruvian Ministry of Energy and Mines.

Source: Peruvian Ministry of Energy and Mines
Magensa Materiales Generales

Jaw Crusher

Magensa Materiales Generales

Jaw crusher which main function is to crush ore to a size of 2 inches approximately.

The jaw crusher consists of 2 jaws of manganese steel of which one is fixed and the other is mobile, ore passes and is crushed between the two jaws, where the mobile jaw performs oscillating movements produced by the rotation of an eccentric axis which in turn is driven by a signal transmitted from a motor pulley.

Source: Peruvian Ministry of Energy and Mines
23Mill diameter (ft)36Mill Length (ft)
Fima

Vibrating screening equipment

Fima

Vibratory Grizzly 3' x 5' (Shaker Vibration No. l) which primary function is to classify the product either letting it move towards conveyor No.1 or sending large minerals to the primary crusher.

The operation of the vibrating screening equipment is through vibration of an eccentric shaft which is cushioned by four sets of springs producing intermittent movement according to the inclination oriented towards the hopper ore crushing.

Source: Sociedad Minera Austria Duvaz
Sociedad Minera Austria Duvaz
US$ 302.8K

Conveyor Belt System

Sociedad Minera Austria Duvaz

Its function is to transfer the ore from the crusher Symons until hoppers fine. The conveyor has a FHP motor with 20HP of power and 1755RPM (460V. 24.8Amp) .

Source: Sociedad Minera Austria Duvaz
.062Length (km)609.6Belt Width (mm)14.91Rated power (KW)
Denver Industrial Pumps

Tailing Pump

Denver Industrial Pumps

Denver Pumps 5"x4" work on stand by mode switching from one to the other, their function is to pump tailings generated on the flotation process towards the end of tailings.

Source: Peruvian Ministry of Energy and Mines
1490.75Pump RPM48Pump power (HP)

Electro welded mesh

Mallas Electrosoldadas SAC

Mesh inch 4x4, BWG # 10 (3.40 mm), product presentation in rolls, black wire type, roll mesh dimension 2.02 x 25 mts.

Source: Mallas Electrosoldadas (Maelsa)
10Birmingham Wire Gage (BWG)4Mesh inch25Mesh length dimension (mts)2.02Mesh width dimension (mts)
IMG_1227-4743

More contracts, contractors and photos are included in the PDF.

Snapshot

Project Status
Production
Production starting date
1906-01-01
Metals mined
Copper
Concentrator facilities (tpd)
800
Area of Mine (ha)
225
legal.unidad
AUSTRIA DUVAZ

Top Contractors

Consorcio Metalúrgico SA (Comesa)
Brynajom
Viceversa Consulting
Proyectos y Estudios Mineros S.A.C
SVS Ingenieros

Similar Projects