Bayovar Mine

Bayovar Mine

The Bayóvar Project is a non-metallic mining project that involves extraction of the phosphate deposits and processing to produce concentrates for export. The Project is located in the district and province of Sechura, department of Piura, approximately 1 000 km north of Lima, 110 km south of Piura and 30 km from the Pacific Ocean. The closest town to the Project area is a cove called Puerto Rico located about 5 km from the proposed port and 40 km from the mine site.

Iconser
2013
US$ 3.9M

Construction and restoration of access roads

Iconser

Rebuilding 3.2 km of access roads for Minera Miski Mayo.

Source: Iconser
3.2Length (km)
Iconser
2013
US$ 2.1M

Construction and restoration of access roads

Iconser

Rebuilding 1.8 km of access roads for Minera Miski Mayo.

Source: Iconser
1.8Length (km)
Iconser
2011
US$ 282.7K

Construction of medical center

Iconser

Construction of medical center for mine and port on phosphate mine Bayóvar .

Source: Iconser
Iconser
2010
US$ 1.2M

Civil, structural and mechanical frameworks

Iconser

Construction of perimeter fence for concentrator plant facilities, discharge zone, belts in the drying zone as well as at zone port on Bayovar phosphate mine.

Source: Iconser
Golder Associates Perú S.A.
2009
US$ 160.7K

Environmental Impact Assessment (EIA)

Golder Associates Perú S.A.

Engineering, Procurement and Construction (EPC)

GyM

The scope included the implementation of the EPC contract of the mine package, the process plant with a capacity of 10,700 t/day and the maintenance shops, in addition to commissioning, start-up and assisted operation of the plant.

Included the implementation of a 2.1 km long overland conveyor.

Source: GyM
3100Engineering man hours (K)0.058Earthworks (million m3)14000Concrete poured (m3)2780Equipment assembly (Tonnes)2950Structural assembly (Tonnes)38000Piping (m)
PRDW Aldunate Vásquez Ingenirios Ltda
2006

Conceptual engineering

PRDW Aldunate Vásquez Ingenirios Ltda

MISKI MAYO, a company from the VALE group (Brazil), appointed PRDW to conduct the conceptual design for a new container terminal in Bayóvar Bay, Sechura, Perú. PRDW was responsible for all marine works and the land side container terminal.
PRDW Aldunate Vásquez Ingenirios Ltda
2006

Conceptual engineering

PRDW Aldunate Vásquez Ingenirios Ltda

MISKI MAYO, a company from the VALE group (Brazil), appointed PRDW to conduct concept and preliminary design of a new jetty in the Bayóvar bay (northern Perú), which is required to load 8 MTPA of phosphate.

Mine Related Infrastructure

Iconser

Project: "Enabling Access to Income Drilling equipment Drying plant "- D = 3500 m. - A = 4.00 m.

Mine Related Infrastructure

Iconser

Mine Related Infrastructure

Iconser

Mine Related Infrastructure

Iconser

Remodeling of Child Park Town Center in Puerto Rico Civil and Electrical Works. Amount: S /. 649,885.63.

Mine Related Infrastructure

Iconser

More contracts, contractors and photos are included in the PDF.