Cerro de Pasco Administrative Economic Unit

Cerro de Pasco Administrative Economic Unit

The Cerro de Pasco Unit is located in the Pasco Region, approximately 295 kilometers away from Lima, and can be reached via the Central Highway. The unit consists of the Paragsha underground mine and the Raul Rojas open pit mine. It also has two concentrate plants: Paragsha and San Expedito. In addition, there are a number of mining projects being developed at this unit.

Shorings

Fameda y Contratistas Generales

Supply of 156 3.5m x 3.5m formwork with an 6" x 6" H beam and 20 pounds/foot.

Source: Fameda y Contratistas Generales
3.5Shoring height (m)3.5Shoring width (m)20Beam capacity (Pound/foot)6Beam H122Shorings quantity

Shorings

Fameda y Contratistas Generales

Supply of 130 3.5m x 3.5m formwork with an 6" x 6" H beam and 20 pounds/foot.

Source: Fameda y Contratistas Generales
3.5Shoring height (m)3.5Shoring width (m)20Beam capacity (Pound/foot)6Beam H130Shorings quantity

Shorings

Fameda y Contratistas Generales

Supply of 156 3.5m x 3.5m formwork with an 6" x 6" H beam and 20 pounds/foot.

Source: Fameda y Contratistas Generales
3.5Shoring height (m)3.5Shoring width (m)20Beam capacity (Pound/foot)6Beam H156Shorings quantity

Geotechnical studies

ZER Geosystem Perú

ISICO geof study by the method of two-dimensional electrical tomography tailings dam project Ocroyoc
Ecología y Tecnología Ambiental (Ecotec)
2013
US$ 108K

Feasibility studies

Ecología y Tecnología Ambiental (Ecotec)

Feasibility study to estimate the infrastructure cost, to modify the approved amount by the SNIP (Sistema Nacional de Inversion Publica), of integral solid waste management in the city of Cerro de Pasco.

Source: Ecotec
Ecología y Tecnología Ambiental (Ecotec)
2013
US$ 35.9K

Technical report

Ecología y Tecnología Ambiental (Ecotec)

Preparation of technical report including: Sanitary landfill engineering design, organic waste treatment plants design, reuse of solid commercial inorganic waste plant design, management in order to modify budget as much as 100% under the Public Investment System.

Support on project approval process by municipal authorities, OPI, MEF, DIGESA and organized population.

Source: Ecotec

Technical report

GMI Ingenieros Consultores

Technical file for the landfill in the Pasco mining operation.

Source: GMI S.A. Ingenieros Consultores

Water transfer

Cosapi Ingeniería y Construcción

The project involves the installation of two pipelines, each of which consists of approximately 30 termobonded-ends spools of HDPE 18 "x 96m and 1,700 m of carbon steel pipe ASTM A53 Gr B 16 "Sch. STD with beveled ends.

Source: Cosapi Ingeniería y Construcción

Construction Management (CM)

Anddes Asociados

Control quality assurance and control quality construction (CQA/CQC) for tailings dam located at Ocroyoc, earthmoving works as well as installation of geomembrane were also included.

Source: Anddes Asociados
US$ 302.8K

More contracts, contractors and photos are included in the PDF.

Snapshot

Top Contractors

Anddes Asociados
Fameda y Contratistas Generales
Ecología y Tecnología Ambiental (Ecotec)
ZER Geosystem Perú
GMI Ingenieros Consultores

Similar Projects

    More similar projects