Milestones

  • 2015

    Second Modification of EIA Approved

  • 2013

    Modification to Closure Plan Submitted

  • 2012

    EIA Approved

  • 2011

    Closure Plan Submitted

RAS Industries Ltd
2012

Pulley Assemblies

RAS Industries Ltd

SVS Ingenieros
2011
US$ 84K

Closure plan preparation

SVS Ingenieros

Metso Corporation
2011
US$ 10.2M

SAG Mill

Metso Corporation

28000Mill rated power (KW)5525Mill capacity (t/h)42Mill diameter (ft)25Mill Length (ft)
Fluor Corporation
2011
US$ 580M

Mine Related Infrastructure

Fluor Corporation

Fluor Corporation
2011
US$ 1.7B

Engineering, procurement and construction management (EPCM)

Fluor Corporation

92000Daily Ore Input tn/day
ABB
2010
US$ 4.5M

Gearless Mill Drive systems (GMDs)

ABB

28000Mill rated power (KW)
Knight Piesold
2010
US$ 160.7K
Confidential

Power Purchase Agreement (PPA)

Confidential

220Power Line Capacity (KV)
ABB
US$ 10.9M

Gearless Mill Drive systems (GMDs)

ABB

15600Mill rated power (KW)
ABB
US$ 10.9M

Gearless Mill Drive systems (GMDs)

ABB

15600Mill rated power (KW)
Proyectos y Estudios Mineros S.A.C

Professional Services

Proyectos y Estudios Mineros S.A.C

Confidential
US$ 302.8K

Conveyor Belt System

Confidential

.198Length (km)6950Transport Capacity (t/h)3.1Belt Speed (m/s)2134Belt wide (m)30Conveyor Elevation (m)
Confidential

Waste Rock Material Storage

Confidential

160Area of Mine (ha)166Storage Capacity (Mt)
Confidential
US$ 302.8K

Conveyor Belt System

Confidential

0.125Length (km)12.5Transport Capacity (t/h)0.5Belt Speed (m/s)13Conveyor Elevation (m)
Confidential

Concentration and processing plant construction

Confidential

Confidential
US$ 302.8K

Conveyor Belt System

Confidential

0.063Length (km)0.5Belt Speed (m/s)
Confidential
US$ 302.8K

Conveyor Belt System

Confidential

2.4Length (km)1500Belt Width (mm)2300Rated power (KW)
Confidential
US$ 302.8K

Conveyor Belt System

Confidential

0.0100Length (km)775Transport Capacity (t/h)1.7Belt Speed (m/s)914.4Belt Width (mm)19Conveyor Elevation (m)
Confidential
US$ 1.6M

Tailing dam construction

Confidential

Confidential
US$ 302.8K

Conveyor Belt System

Confidential

0.085Length (km)775Transport Capacity (t/h)2.8Belt Speed (m/s)914.4Belt Width (mm)16Conveyor Elevation (m)
Confidential
US$ 928.9K
Confidential

Floation Blower

Confidential

38120Flow rate (m3/h)80Pressure (kpa)
Confidential

Floation Blower

Confidential

38120Flow rate (m3/h)80Pressure (kpa)
Metso Corporation
US$ 5.4M

Ball Mill

Metso Corporation

15600Mill rated power (KW)26Mill diameter (ft)42Mill Length (ft)
Confidential

Floation Blower

Confidential

38120Flow rate (m3/h)80Pressure (kpa)
Metso Corporation
US$ 5.4M

Ball Mill

Metso Corporation

26Mill diameter (ft)42Mill Length (ft)
Confidential

Floation Blower

Confidential

38120Flow rate (m3/h)80Pressure (kpa)
Metso Corporation

Gyratory crusher

Metso Corporation

6950Mill capacity (t/h)4.99Mill diameter (ft)6950Crushing Plant Capacity (tonnes/h) 9.416Mill Length (ft)
Confidential

Waste Rock Material Storage

Confidential

465Storage Capacity (Mt)
Confidential

Water management

Confidential

Reservorio Superior.-en la cuenca del río Jadibamba, con capacidad del reservorio de 7.6 Mm3

More contracts, contractors and photos are included in the PDF.

Snapshot

Capital Expenditure
US$ 4.8B
Project Status
Suspension
Mineral reserves (Million Tonnes)
570
Copper Annual Output (Tonnes)
54000
Gold Annual Output (Ounces)
680000
Electricity Requirement (MW)
100

Top Contractors

Fluor Corporation
ABB
Metso Corporation
Knight Piesold
Schlumberger Water Services Peru