Feasibility studies for improving access of local road R45 which included 2 bridges, a pontoon and works of art in the 32 km of development.
Feasibility study of the access road to Corani project.
Source: Anddes Asociados
Conducting 2015 biological monitoring for Corani project, works include monitoring of terrestrial flora and fauna (two wet and dry seasons) as well as hydro-biological monitoring.
Preparation of the identification report according to ECA guidelines for soil sampling.
Source: Anddes Asociados
Geotechnical field investigations consisting on diamond drilling, oriented logging, special tests packer, installation of hydraulic as well as vibrating wire piezometers, quarry studies.
Geotechnical study of concentrator plant foundation comprising primary crusher, mills, flotation area, concentrate thickener, tailings thickeners, truck shop.
Source: Anddes Asociados