Corani mine

Corani mine

Feasibility studies

Anddes Asociados

Feasibility studies for improving access of local road R45 which included 2 bridges, a pontoon and works of art in the 32 km of development.

Feasibility study of the access road to Corani project.

Source: Anddes Asociados

Biological monitoring

Anddes Asociados

Conducting 2015 biological monitoring for Corani project, works include monitoring of terrestrial flora and fauna (two wet and dry seasons) as well as hydro-biological monitoring.

Preparation of the identification report according to ECA guidelines for soil sampling.

Source: Anddes Asociados
M3
2011
US$ 108K
Blue Coast Metallurgy
2011
US$ 108K

Feasibility studies

Blue Coast Metallurgy

Global Resource Engineering
2011
US$ 108K

Feasibility studies

Global Resource Engineering

Independent Mining Consultants
2011
US$ 108K

Feasibility studies

Independent Mining Consultants

Geotechnical studies

Anddes Asociados

Geotechnical field investigations consisting on diamond drilling, oriented logging, special tests packer, installation of hydraulic as well as vibrating wire piezometers, quarry studies.

Geotechnical study of concentrator plant foundation comprising primary crusher, mills, flotation area, concentrate thickener, tailings thickeners, truck shop.

Source: Anddes Asociados
Confidential
2009
US$ 142.5K
Ausenco Limited
US$ 108K

Feasibility studies

Ausenco Limited

Ausenco Limited

Economic studies

Ausenco Limited

Ausenco Limited
US$ 99.4K

Geotechnical studies

Ausenco Limited

Ausenco Limited

Water management

Ausenco Limited

Ausenco Limited

Specialist Support

Ausenco Limited

More contracts, contractors and photos are included in the PDF.

Snapshot

Capital Expenditure
US$ 600M
Production starting date
January 2016
Environment Impact Study Approval Date
December 2012
Silver Annual Output (Ounces)
135000

Top Contractors

Walsh Peru S.A
Anddes Asociados
Ausenco Limited
Global Resource Engineering
M3