La Arena

La Arena

http://www.rioaltomining.com/projects/la_arena/facts/ Steady and consistent operations at attractive cash costs with cost reduction under way 2014E production of 215 to 225 kozs 2014E cash costs of US$575 to $600/oz 2014E all-in sustaining costs of US$775 to $800/oz Ongoing drilling success Significant future cash flow growth with the development of Phase II copper-gold deposit Prospective land package of around 30,000 hectares in a well-established gold mining district in Peru Strong community support Phase II Feasibility Study in Q1, 2015

SVS Ingenieros
2013

Closure Plan

SVS Ingenieros

Mining Plus
2013
US$ 35.9K

Technical report

Mining Plus

Haul Profiles, Whittle Optimisation, Pit Designs, Scheduling, NI 43-101 Oxide Report

Mine Construction

Stracon GyM

Development, construction and mining activities of the mine through an Alliance Agreement.

Mine planning, drilling, blasting, loading and hauling of ore and waste. Currently constructing a 15ha leach pad and associated mine infrastructure, mining 37.8 million tons of ore and waste per annum.

Source: Stracon GyM S.A.
Technologia XXI
2009
US$ 160.7K

Detailed engineering

Anddes Asociados

Detailed engineering of topsoil dump, dump temporary clearing, extension of Phase 1 Botadero 2. Development plan of ore stacking ore on 1B, 2 and 3 Phases of leach pad. CQA and CQC of Phases 1B and 2 of leach pad expansion, pond major events and waste rock dump construction.

MQA of LLDPE geomembrane 2mm in Polytex manufacturing. Geotechnical investigations of the dump Arena Stage 2 and variant Trujillo- Huamachuco road. Geotechnical study sulphide project plant foundation. Geotechnical study of fuel tanks and force home foundation.

Source: Anddes Asociados

More contracts, contractors and photos are included in the PDF.