Preparation of Technical Report and Modification of Semi-Detailed Environmental Impact Assessment (EIASD).
The aim of Technical Report is to modify the location of complementary and auxiliary components, incorporate 45 new exploration drilling and opening a mine entrance without making enlargements of underground workings already approved .
Given the characteristics of the relocation of ancillary components as well as evaluating the environmental impacts of such changes, it is concluded that such modifications do not generate significant impacts.
Source: Geoservice Ingeniería.
Currently developing the mine for La Zanja greenfield project. Providing mining services for the operation of South San Pedro and Pampa Verde open pits to produce 100,000 oz. of gold per year. Mining 16 million tons of ore and waste annually.
Source: Stracon GyM S.A.
Slope stabilization of Pampa Verde Road. Design review of the leach pad Phases 3 and 4 and optimization proposals for improving buildability. Updated hydrological study and water balance of the leach pad .
Review, processing and evaluation of geotechnical instrumentation installed in the mine. Design of two waste dumps for surplus building materials. Review of slope stabilization of Pampa Verde Road.
Final design of pit slopes on Pampa Verde. Platform design of sour water treatment plant. Sedimentation dams design.
Source: Anddes Asociados
US$ 440.7K
Transportation of materials
Multiservicios Punre S.R.L.
Transport of aggregates and clay from Chilete towards the zanja mine. Construction of local road from shingles house towards gordillo, transportation of material in the trench mining facilities.
Source: Multiservicios Punre S.R.L