Macusani Yellowcake Peru

Macusani Yellowcake Peru

Milestones

  • 2014

    PEA

Wardell Armstrong International
2015
US$ 108K

Feasibility studies

Wardell Armstrong International

GBM Minerals Engineering Consultants Limited
2015

Economic Assessment Technical Report

GBM Minerals Engineering Consultants Limited

The Mineral Corporation of South Africa
2015

Economic Assessment Technical Report

The Mineral Corporation of South Africa

http://www.marketwatch.com/story/plateau-uranium-announces-new-mining-inventories-as-part-of-its-ongoing-pea-update-2015-12-01
Confidential
2014
US$ 142.5K

Pre-feasibility studies

Confidential

417NPV8 (US$ M)32.4IRR3.5Payback331Initial Capex10Mine life
GBM Minerals Engineering Consultants Limited
2013
US$ 142.5K

Pre-feasibility studies

GBM Minerals Engineering Consultants Limited

GBM Minerals Engineering Consultants Limited
2008
US$ 142.5K

Pre-feasibility studies

GBM Minerals Engineering Consultants Limited

GBM Minerals Engineering Consultants Limited
US$ 142.5K

Pre-feasibility studies

GBM Minerals Engineering Consultants Limited

GBM Minerals Engineering Consultants Limited

Economic studies

GBM Minerals Engineering Consultants Limited

More contracts, contractors and photos are included in the PDF.

Snapshot

Capital Expenditure
US$ 331M
Project Status
Feasibility
Metal Annual Output (Tonnes)
4.30 million lbs U3O8
Mine Type
U3O8
Mineral reserves (Million Tonnes)
49.7 M lbs contained U3O8
Life of Mine LoM (Years)
10