Marcona Iron Mine

Marcona Iron Mine

With approximately 150 km2, is the place where the exploration work is carried out continuously and the exploitation of minerals under the system of open pit, drill and shooting, that are then mineralized rocks transported by dump trucks and shovels with a capacity of up to 150 tonnes to crushers, where after the process of crushing the iron ore is stacked and then transported to San Nicolas, by a conveyor belt of approximately 15.3 kilometers long with a capacity of 2000 tons per hour.

Geotechnical studies

Anddes Asociados

Geotechnical investigations for processing plant.

Source: Anddes Asociados

Archaeological evaluations

GMI Ingenieros Consultores

Marcona mine expansion archaeological evaluations.

Source: GMI S.A. Ingenieros Consultores

Construction Management (CM)

GMI Ingenieros Consultores

EPC work supervision for project - First stage operation and process plant expansion.

Source: GMI S.A. Ingenieros Consultores
Cosapi Ingeniería y Construcción
2013
US$ 540M

Mine Related Infrastructure

Cosapi Ingeniería y Construcción

Detailed engineering

GMI Ingenieros Consultores

Basic and detail engineering of magnetic plant as well as filtration plant Line 9 as part of the production increase from 8 to 10 million tons per year.

Magnetic plant design included a new ball mill with a 5.03m diameter and 4,830HP as well as 06 flotation cells with a capacity of 30m3 each. The filtration plant had the following dimensions: 49.5m x 7.0m x 16.5m.

The design included 4 filters of 10'6"as well as a total of 5 pumps.

Source: GMI S.A. Ingenieros Consultores
25.022Engineering man hours (K)

Construction Management (CM)

GMI Ingenieros Consultores

Construction supervision of new stocks and transfer systems for iron ore shipment Phases II, III and IV, as well as additional works.

The project included storage expansion and the transportation of bulk ore from the new stocks to the shipment. The transfer system capacity was increased from 4,000 to 6,600 tph.

Source: GMI S.A. Ingenieros Consultores
19.611Engineering man hours (K)

Circuit board repair

GTO Peru

Repair and maintenance of electronic components including Terex truck cards.

Repaired Terex cards: IGBT control modules 41A296305EDP1, 17FB144 card, 17FB172 card.

Source: GTO Peru

Construction Management (CM)

GMI Ingenieros Consultores

GMI supervised project portfolio to: Increase the iron concentrate from 8 to 10 million tonnes per year, expand its storage capacity and bulk mineral transport from the new stocks to the shipping area, increase and maximize its existing installations. A Conservation Plan was also developed.

This supervision services included: "The Line 9 Improvement Project in the Magnetic Plant, the Implementation of the New Filtration Plant", and "The 9th Milling Line Improvement, for the increase in production from 8 to 10 million Tonnes per year.

"The New Stocks and Transfer Systems for Iron mineral shipment – Phases II, III and IV, as well as complementary works" to increase the mineral shipping from 4000 to 6600 TPH.

Source: GMI S.A. Ingenieros Consultores
42.564Engineering man hours (K)

Iron mining operations

Stracon GyM

Between 2008 and 2012, Stracon GyM S.A. provided drilling, blasting, loading and hauling services to develop open pit iron ore mines.

Stracon GyM S.A. mined 32 million tons of ore and waste per year using hydraulic shovels and 100t mining trucks.

Source: Stracon GyM S.A.
32Annual iron ore mined (Million Tonnes)

More contracts, contractors and photos are included in the PDF.

Snapshot

legal.unidad
CPS 1

Top Contractors

Cosapi Ingeniería y Construcción
EPCM Experts
GMI Ingenieros Consultores
Anddes Asociados