With approximately 150 km2, is the place where the exploration work is carried out continuously and the exploitation of minerals under the system of open pit, drill and shooting, that are then mineralized rocks transported by dump trucks and shovels with a capacity of up to 150 tonnes to crushers, where after the process of crushing the iron ore is stacked and then transported to San Nicolas, by a conveyor belt of approximately 15.3 kilometers long with a capacity of 2000 tons per hour.
More contracts, contractors and photos are included in the PDF.