Parcoy gold mine

Parcoy gold mine

Construction Management (CM)

Geoservice Ingeniería

Construction management for Rumpuy California river channeling.

Source: Geoservice Ingeniería

Accelerograph installation

Georys Ingenieros

Installation of 02 Kinemetrics accelerograph (Obsidian model) in Yuracyacu tailings dam - Consorcio Minero Horizonte.

Installing of the first Obsidian accelerograph was performed near the filtration plant and waste treatment plant. The second Obsidian accelerograph was installed near the pipes reduction pressure plant, near to the rocky outcrop area.

Works included drilling on the concrete base where the accelerograph was placed; installation, levelin , orientation, antenna connection and verification of parameters, calibration test generation and respective CMH personnel training.

Works executed for Obrainsa.

Source: Georys Ingenieros
cmh-pic12cmh-pic10cmh-pic9

Technical report

Geoservice Ingeniería

Mining technical report preparation for Curaubamba filtered tailing dam as well as dumps dam bench No.6 formation.

Source: Geoservice Ingeniería

Closure plan preparation

Geoservice Ingeniería

Preparation of Parcoy mining unit Closure Plan (CP) 4th modification. CP components include: mine, processing facility, facilities for tailing management, water management facilities and other areas.

The closure activities include: Progressive closure (until 2024), final closure and post closure activities. CP budget stands at USD 21.222 MM (inc VAT). Final closure and post-closure activities have an implementation period of 04 and 05 years respectively.

According to directorial resolution Nº439-2015-MEM/DGAAM given on November 13th 2015, Peruvian Ministry of Energy and Mines approved the Parcoy mining unit Closure Plan 4th modification.

Source: Peruvian Ministry of Energy and Mines, Geoservice Ingeniería
21.222Closure mine budget (USD MM)19.281Closure plan warranty (USD MM)

Engineering and Design

Geoservice Ingeniería

Redesign of Alpamarca - Yuracyacu tailings transport.

Source: Geoservice Ingeniería

Drilling supervision

Geoservice Ingeniería

Diamond drilling supervision on Rumpuy as well as Seca areas.

Source: Geoservice Ingeniería

Closure plan preparation

Geoservice Ingeniería

Preparation of Parcoy mining unit Closure Plan (CP) 3rd modification. CP components include: plant, water management facilities, tailing dam, dumps dam and other areas.

The closure activities include: Progressive closure (until 2024), final closure and post closure activities. CP budget stands at USD 18.682 MM (inc VAT). Final closure and post-closure activities have an implementation period of 04 and 05 years respectively.

According to directorial resolution Nº146-2015-MEM/DGAAM given on March 24th 2015, Peruvian Ministry of Energy and Mines approved Parcoy mining unit Closure Plan 3rd modification.

Source: Peruvian Ministry of Energy and Mines, Geoservice Ingeniería
18.682Closure mine budget (USD MM)15.460Closure plan warranty (USD MM)

Mining Projects Evaluation Studies

Geoservice Ingeniería

Construction Management (CM)

Geoservice Ingeniería

Supervision of the tailings dam and Yuracyacu filter plant construction. The work also involved tailings line transport and other installation works management and supervision.

Yuracyacu plant is Consorcio Minero Horizonte processing plant located in Parcoy with a treatment capacity recently increased to 2,000 TMD.

Source: Consorcio Minero Horizonte
geoservice-cmh-parcoy1

Hydrogeological studies

Geoservice Ingeniería

Hydrogeological & Geotechnical Services Perú S.A.
2013

Hydrological studies

Hydrogeological & Geotechnical Services Perú S.A.

Buenaventura Ingenieros S. A. (BISA)
2012
US$ 160.7K

Environmental Impact Assessment (EIA)

Buenaventura Ingenieros S. A. (BISA)

More contracts, contractors and photos are included in the PDF.