Pierina Gold Mine

Pierina Gold Mine

Detailed engineering

Anddes Asociados

Detail engineering for PCN02 sediment basin. 2016

Source: Anddes Asociados

Construction Management (CM)

Anddes Asociados

Control Quality Assurance (CQA) for installation of geotechnical instruments for PCNs pools as well as inclinometers for dike leach pad.

Source: Anddes Asociados

Technical report

Anddes Asociados

Dossier preparation for the concession modification of Phase 7A leach pad new facility project.

Source: Anddes Asociados

Detailed engineering

GMI Ingenieros Consultores

Detailed engineering for he pumping station that supplies to ARD 450 water treatment plant.

Source: GMI Ingenieros Consultores

Geotechnical studies

ZER Geosystem Perú

Geophysical assessment by Seismic Refraction, Multichannel Analysis of Surface Waves in Two-Dimensional Arrangement (MASW 2D) and Electric Tomography Bidimensional as part of the project "Geophysics Jobs in Phase 0 of Leach Pad.

The evaluation consisted in geophysical exploration procedure of field trials by seismic refraction, MASW 2D through which the power of the layers and the interpretation of speeds P (Vs) waves and S (Vs) waves were determined besides the evaluation of dynamic parameters within the field.

The geophysical evaluation also involved conducting field exploration by tests of electrical tomography, whereby the values ​​of resistivity and chargeability of the area were determined to visualize the electrical properties of the subsurface.

Seismic geophysical exploration was carried out in order to determine the velocity of propagation Vp and Vs of ground in areas of study by testing surface seismic refraction.

Source: ZER Geosystem Perú S.A.C

Engineering and Design

Anddes Asociados

Design of the alternative Bravo 22 access to mine from Km 12+410 to km 13+100. Plant location and design of the new mine control access platform and truck scale platform. Design of alternatives for the access located within the Pacchac area for DETOX and ARD plants platforms.

Source: Anddes Asociados

Geotechnical studies

ZER Geosystem Perú

Installation ng, Commissioning and Maintenance of Accelerometer Model K2 in Leach Pad Dock of the Pierina Mine, Huaraz
Ausenco Limited
US$ 530K

Geotechnical studies

Ausenco Limited

Ausenco Limited
US$ 213.3K
Ausenco Limited

Environmental, Health and Safety (EHS) reviews

Ausenco Limited

Ausenco Limited
US$ 3.9M

Mine Related Infrastructure

Ausenco Limited

Ausenco Limited

Water management

Ausenco Limited

Ausenco Limited

Heap Leach Pad

Ausenco Limited

1300000Surface Area (m2)
Ausenco Limited
US$ 394.1K
Ausenco Limited
US$ 108K

Feasibility studies

Ausenco Limited

More contracts, contractors and photos are included in the PDF.

Snapshot

Capital Expenditure
US$ 2.5M
Project Status
Closure
Production starting date
October 1998
legal.unidad
PIERINA

Top Contractors

Ausenco Limited
Anddes Asociados
ZER Geosystem Perú
GMI Ingenieros Consultores