Poracota

Poracota

EXPLO DRILLING PERU SCRL
2012

Drilling

EXPLO DRILLING PERU SCRL

Tunnel construction

Stracon GyM

Starting on May 2006, construction of a tunnel and various civil works were developed.

Activities included exploration work, preparation, development and mining services, running horizontal excavations as: Ramps; galleries; cruises; by pass; windows; sublevels and lunges. Vertical mine as: Fireplaces, who had a double compartment, bins and breaks.

Additionally the installation and maintenance of the line system for the transport Cauville material was performed along with various civil works such as construction and repair of concrete curbs, slabs and walls.

Source: Stracon GyM S.A.
15.46Length (km)

More contracts, contractors and photos are included in the PDF.