Tradeoff and pre-feasibility study for leach pad, ponds and waste rock dam expansions.
Analysis includes seismic hazard studies, design of pipe collection and re-configuration of sub-drainage system.
Source: Anddes Asociados
Technical inspection and construction quality assurance of geomembrane installation in the leach pad.
Preparation of tender documents and selection of bidders for Phase 2A of leach pad construction. Engineering support during Phases 2A and 2B building. Construction management for Phases 2A and 2B of the leach pad.
Source: Anddes Asociados
Construction management and CQA for leach pad phases 2A and 2B. Works included engineering support during construction of said phases.
Source: Anddes Asociados
Repair and maintenance of electronic components including Walton cards as well as different electronic cards for several machineries.
Repaired Watlow cards: Power controllers PC20-F30B-0000.
Others electronic component repaired: SCR drive card, drive CM- MFDSC card, feedback card, ADX-618 card.
Source: GTO Peru
Detailed engineering review for leach pad Phase 2A and 2B. Preparation of tender documents for leach pad Phase 2A construction. Selection of bidders for teach pad Phase 2A construction.
Stability verification of initial ore stacking ore on leach pad.
Source: Anddes Asociados
2012
Integrated engineering and construction management
Civil, mechanical, electrical and instrumentation works on Pucamarca Unit processing plant, the service includes construction of extraction and production gold plant along with all its related plants necessary for their operation.
Source: Cosapi Ingeniería y Construcción