Yauli Administrative Economic Unit

Yauli Administrative Economic Unit

The Yauli Unit is located in the Junín Region, 40 kilometers from the city of La Oroya and 170 kilometers from Lima, and it is accessible by road and rail. The units consists of four underground mines and an open pit, from which the ore is treated in three concentrate plants with a total installed capacity of 10,600 tpd. In 2013, treatment of ore at the unit\\\'s three concentrate plants reached 3.7 million tons, with head grades of 4.67% Zn, 0.95% Pb, 0.15% Cu and 3.36 oz Ag/MT, representing 58% of Volcan\\\'s consolidated treated ore.

In 2013, concentrate production totaled 304,600 tons of zinc, 59,500 tons of lead, and 10,200 tons of copper, which together contributed 10.8 million ounces of silver fines in concentrate.

Source: Volcan

Technical report

Geoservice Ingeniería

Technical report preparation for San Cristobal mine mining components adequacy.

Source: Geoservice Ingeniería

Technical report

Geoservice Ingeniería

Technical report preparation for Carahuacra mine mining components adequacy.

Source: Geoservice Ingeniería

Technical report

Geoservice Ingeniería

Technical report preparation for Ticlio mine mining components adequacy.

Source: Geoservice Ingeniería

Technical report

Geoservice Ingeniería

Technical report preparation for Andaychagua mine mining components adequacy.

Source: Geoservice Ingeniería

Metal hooks

Fameda y Contratistas Generales

Supply of 1500 0.75" 2-bodies metal hooks made of corrugated iron to be used at San Cristobal mine.

Source: Fameda y Contratistas Generales
0.75Metal hook diameter (inches)1500Metal hooks quantity2Metal hook bodies

J support

Fameda y Contratistas Generales

Supply of 400 2-divisions J supports to be used at Ticlio mine.

Source: Fameda y Contratistas Generales
2J support divisions400J support quantity

Metal hooks

Fameda y Contratistas Generales

Supply of 500 0.5" 3-bodies metal hooks made of corrugated iron to be used at San Cristobal mine.

Source: Fameda y Contratistas Generales
0.5Metal hook diameter (inches)500Metal hooks quantity3Metal hook bodies

Metal hooks

Fameda y Contratistas Generales

Supply of 250 0.75" 3-bodies metal hooks made of corrugated iron to be used at San Cristobal mine.

Source: Fameda y Contratistas Generales
0.75Metal hook diameter (inches)250Metal hooks quantity3Metal hook bodies

Metal hooks

Fameda y Contratistas Generales

Supply of 80 0.75" 3-bodies metal hooks made of corrugated iron to be used at Ticlio mine.

Source: Fameda y Contratistas Generales
0.75Metal hook diameter (inches)80Metal hooks quantity3Metal hook bodies

J support

Fameda y Contratistas Generales

Supply of 80 2-divisions J supports to be used at Ticlio mine.

Source: Fameda y Contratistas Generales
2J support divisions80J support quantity

Metal ribbed sheets

Fameda y Contratistas Generales

Supply of 500 metal-ribbed sheets with dimensions 3mm x 1m x 1.5m to be used in Andaychagua mine.

Source: Fameda y Contratistas Generales
1Metal sheet width (m)1.5Metal sheet length (m)3Metal sheet thickness (mm)500Metal sheets quantity

Metal hooks

Fameda y Contratistas Generales

Supply of 500 0.75" 3-bodies metal hooks made of corrugated iron to be used at San Cristobal mine.

Source: Fameda y Contratistas Generales
0.75Metal hook diameter (inches)500Metal hooks quantity3Metal hook bodies

J support

Fameda y Contratistas Generales

Supply of 300 2-divisions J supports to be used at Ticlio mine.

Source: Fameda y Contratistas Generales
2J support divisions300J support quantity

J support

Fameda y Contratistas Generales

Supply of 450 3-divisions J supports to be used at Ticlio mine.

Source: Fameda y Contratistas Generales
3J support divisions450J support quantity

Construction Management (CM)

Geoservice Ingeniería

Construction Quality Assurance service for expansion of Mahr Tunel Tailings Deposition No. 6 (Cota 4,036m) .

The tailings dam No. 6 Mahr Tunel has an elevation approved project to 4,032m. Currently, this dam is located at an elevation of 4,016.6m occupying an area of ​​48,817.8 m2. Whereas the concentrator operation requires a place where to keep depositing tailings being generated, Volcan company has prepared engineering studies required for regrowth of the tailing deposit from the boundary elevation of 4,032 m to 4,036 m.

With this regrowth, the final area occupied by the tailings deposit No. 6 will be 112,335 m2, 0.11 ha bigger than the related tailings dam at an elevation of 4,032 m, which represents 0.92% of the total area of the sludge .

Source: Geoservice Ingeniería

Geotechnical studies

ZER Geosystem Perú

Study of Soil Mec Anica purposes Foundation - Camp Chaquipampa. Huay Huay - Yauli - Junin

Mine Related Infrastructure

Anddes Asociados

C2 Mining
2013
US$ 516.8K

Wireless Network

C2 Mining

Wireless communication system for mine surface and backhaul link in Yauli mining unit .

Source: C2 Mining

Geotechnical studies

ZER Geosystem Perú

Study Geot echnical plant processes Morococha - Yauli - Junin.

Geotechnical studies

ZER Geosystem Perú

Study Geot echnical in carguios Zone - Carahuacra. Yauli - Junin.

Geotechnical studies

ZER Geosystem Perú

Study of Physical Stability for the Regrowth of the sludge Tunnel No. 3 Mahr. Yauli - Junin.

Geotechnical studies

ZER Geosystem Perú

Danger S ísmico Study for St. barbaric Pallanga Carhuacayán Project - Yauli - Junin.

Geotechnical studies

ZER Geosystem Perú

Seismic refraction survey ng, MASW and MAM for Cantera Esperanza tailing 6 Marh Tunnel Yauli - Junin.

Geotechnical studies

ZER Geosystem Perú

Study of Seismic refraction ng, MASW and Mam Foundation for Victoria Staff curve pumping Chumpe Project Yauli - Junin.

Geotechnical studies

ZER Geosystem Perú

Study of Seismic refraction ng, MASW and MAM for Tailings Deposit Chumpe, Yauli - Junin
C2 Mining
2011
US$ 760K

Wireless Network

C2 Mining

Wireless interior mine (Underground) Network. (Yauli – San Cristobal, Yauli – Andaychagua, Yauli – Carahuacra).

Source: C2 Mining

Road definitive studies

Iconeg Ingeniería y Construcción

Final study of dirt road Pomacocha-Iscopampa located in Yauli, Junin, Peru at an altitude of 4,200 meters above sea level.

Source: Iconeg
6Road wide (m)12Road length (Km)

Electro welded mesh

Mallas Electrosoldadas SAC

Mesh inch 4x4, BWG # 08 (4.20 mm), product presentation in rolls, galvanized wire type, roll mesh dimension 2 x 25 mts.

Source: Mallas Electrosoldadas (Maelsa)
08Birmingham Wire Gage (BWG)4Mesh inch25Mesh length dimension (mts)2.02Mesh width dimension (mts)
rollo4x4N8-4749
C2 Mining

Voice & Unified Communications

C2 Mining

C2 Mining

IP Telephone Network

C2 Mining

Cisco IP Telephone Network with PTT.

More contracts, contractors and photos are included in the PDF.