Mineral concentrates terminal in Callao

Mineral concentrates terminal in Callao

Engineering and Design

GMI Ingenieros Consultores

Engineering of the new mineral recovery system (thickener) that uses water from washed Toromocho mine wagons.

Source: GMI S.A. Ingenieros Consultores

Detailed engineering

GMI Ingenieros Consultores

Detailed engineering of new washing stations, truck weighing and modifications of the emergency hopper in Callao warehouses.

Source: GMI S.A. Ingenieros Consultores

Detailed engineering

GMI Ingenieros Consultores

Detailed engineering and procurement for the expansion and modernization of the warehouses and mineral handling systems, including reception, storage and dispatch.

The main warehouse (Cormin I) was increase from 80 to 110 ton capacity and two additional industrial buildings were designed. Also, a total of 11 transportation belts were designed, 9 of them conventional for a total of 1,400 meters and 2 of them pipe conveyors for a total of 250 meters.

The project included a new administration building, maintenance workshops, internal vehicle roads, electric supply for the operation of the new installations and the control systems.

Source: GMI S.A. Ingenieros Consultores
72.331Engineering man hours (K)

More contracts, contractors and photos are included in the PDF.

Snapshot

Capital Expenditure
US$ 80M

Similar Projects

    More similar projects